首页> 中文期刊> 《爆破器材》 >双重预裂与定向抛掷爆破相结合在露天煤矿削坡减载工程中的应用

双重预裂与定向抛掷爆破相结合在露天煤矿削坡减载工程中的应用

         

摘要

Double pre-splitting blasting and directional throw blasting were combined in slope cutting and unloading engineering by removing dangerous rock from high slope site to the assigned area.At the same time, the reserved rock was stabilized using double pre-splitting blasting.Compared with traditional pre-splitting blasting, double pre-split blasting could reduce the damage of slope due to throwing blasting by the formation of a layer of 1.0 m broken zone around the opening line before the explosion of the main holes.Compared with pre-cracking formed by traditional pre-splitting blasting, the protection of retaining rock is much more obvious.And compared with double pre-splitting blasting or directional throw blasting used in slope cutting and unloading, this method has the advantages of high efficiency, fast forming, and the good stability of the slope.It has been used in the second phase of slope cutting and unloading engineering in Heishan Coal Mine.Results show that the engineering quantity of slope cutting is up to 30 ×104 m3 , and the slope forming area is more than 1 ×104 m2 .%通过双重预裂爆破和定向抛掷爆破相结合,将高边坡危岩爆破抛掷至指定位置,起到削坡减载的作用.同时,利用双重预裂爆破稳定预留岩体.相对于传统预裂爆破,双重预裂爆破能更好地减弱抛掷爆破对预裂边坡的损坏,在主炮孔起爆前沿开口线形成一层1.0 m左右的破碎带;相对于传统预裂孔形成的预裂缝,保护预留岩体的作用更加明显;与目前使用预裂爆破或者抛掷爆破常规手段进行削坡减载相比,具有效率高、成型快、边坡稳定性好的优点.在黑山煤矿二期削坡减载工程中的实际运用中,一次削坡工程量达30×104 m3,边坡成型面积达1×104 m2以上.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号