[1]College of Civil Engineering and Architecture, Guangxi University, Nanning 530004, China;
[2]Guangxi Communications Investment Group Co., Ltd., Nanning 530022, China;
[3]Guangxi Road and Bridge Engineering Group Co., Ltd., Nanning 530011, China;
Concrete-filled; steel; tube; (CFST); arch; bridge; Steel-reinforced; concrete; arch; bridge; Cable-stayed; fastening-hanging; cantileverassembly; Vacuum-assisted; pouring; in-tube; concrete; Adjusting; load; by; stay; cables;