The energy consumption of the Changchun No.2 Co-generation Power Co.,Ltd.(re-ferred to the No.2 heat)in 6×200MW EHV units start-stop is described in this paper.Accord-ing to the experimental comparison before and after the equipment transformation and the start-stop mode of the equipment,the economic factors which influence the unit start-stop are ana-lyzed,and the technical measures to reduce the energy consumption in the process of unit start-stop are put forward.%本文阐述了某热电有限责任公司6×200MW 超高压机组近年来的启停节能状况。从设备改造前后试验对比和设备启停方式分析了影响机组启停的经济因素,提出了机组启停节能降耗的优化运行技术措施。
展开▼