首页> 外文期刊>工程科学:英文版 >Some Rock and Soil Mechanical Issues in TGP Construction
【24h】

Some Rock and Soil Mechanical Issues in TGP Construction

机译:三峡工程建设中的一些岩土力学问题

获取原文
获取原文并翻译 | 示例
       

摘要

The Yangtze Three Gorges Project (TGP) is the key backbone project to develop and harness the Yangtze river in China. As the largest water conservancy project in the world with the earth and rock excavation amounting up to 102.83 × 106 m3 , it is, the refore, thelargest project on a scale of geomechanical engineering. The involvement of numerous domestic and foreign research institutes in the scientific research has promoted the development of geomechanics. Some rock and soil mechanical issues arising during construction of the Three Gorges Project are discussed in this article.
机译:长江三峡工程(TGP)是发展和利用中国长江的重要骨干工程。土石方开挖工程是世界上最大的水利工程,土石方开挖面积达102.83×106 m3,因此是地质机械工程规模最大的工程。国内外众多科研机构的参与推动了地质力学的发展。本文讨论了三峡工程建设过程中出现的一些岩石和土壤力学问题。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号