Technology for long cable erection of a thousand-meter scale cable-stayed bridge

机译:千米斜拉桥长电缆架设技术

获取原文
获取原文并翻译 | 示例
           

摘要

In the background of the construction of Sutong Yangtze River Bridge (short as Sutong Bridge), the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced. Some key construction techniques, such as outspreading cable on deck, installing cable at pylon, pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
机译:在苏通长江大桥(简称苏通大桥)的建设背景下,介绍了千米规模斜拉桥的电缆施工方法和技术。讨论了一些关键的施工技术,例如将电缆扩展到甲板上,在塔架上安装电缆,在具有甲板的附件处拉动和固定电缆以及保护电缆PE护套。

著录项

  • 来源
    《工程科学(英文版)》 |2009年第1期|59-62|共4页
  • 作者

    Rao Huarong; Deng Huibin;

  • 作者单位

    Wuhan Second Navigational Road and Bridge Special Engineering Co.,Ltd.,Wuhan 430071,China;

    Wuhan Second Navigational Road and Bridge Special Engineering Co.,Ltd.,Wuhan 430071,China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 建筑施工;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号