Specific requirements and methods of settlement monitoring which were used in bridge of unballasted track passenger dedicated line or high-speed railway are introduced systematically, and mathematical model and determinant conditions of settlement were proposed simultaneously, taking Beijing--Tianjin intercity railway as an example.
展开▼