This paper introduces that there are different operating parameters for the two sets of waste heat steam generators which set in Guixi Smelterunder different steam conditions.Through analyzing and calculating the operation parameters of the 1#, 2# turbine generator units, the energy conversion efficiency and economic benefit of turbine generator set which under different state point are concluded, so the overall economical operation mode promotionof turbine generator set is find out.%贵溪冶炼厂一、二系统两台余热饱和蒸汽发电机组在不同蒸汽条件状态下运行参数各不相同,通过对1#、2#透平发电机组运行参数的分析计算,得出不同状态点下透平发电机组的能量转换效率及经济收益,从而找到提升透平发电机组总体经济性的运行方式.
展开▼