As an engineering background of a Hollow stone arch bridge,the performance assessment process based on the regular periodic inspection,static and dynamic loading test and later maintenance management work was introduced. The maintenance measures and suggestions were proposed from the perspective of basic management department,and provided reference for the similar structures in the future.%以某空腹式石拱桥为工程背景,介绍了基于常规定期检查、动静载试验结果进行桥梁性能评估的过程及后期维护管理工作,并从基层管理部门的角度提出了管理维护措施和建议,为今后类似结构桥梁的管理提供了参照。
展开▼