首页> 中文期刊> 《计算机工程与应用》 >效率异质型员工项目调度算法研究

效率异质型员工项目调度算法研究

         

摘要

研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型.为解决此N-P-hard问题,提出了基于优先规则的启发式算法,其在每次迭代中根据优先约束和优先规则选择优先任务员工对以分配任务,直至所有任务都完成调度.通过应用启发式算法生成初始调度,选用交换邻域结构和插入邻域结构产生邻域调度,并使用改进的前向递归算法求解目标函数值,构造出混合模拟退火算法.数值实验显示该算法能快速准确地进行寻优.%Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered,and the corresponding integer linear programming is presented. To solve the NP-hard problem,a priority rule-based heuristic is proposed,which selects the prior task-employee pair according to precedence constraints and priority rule to assign the task at each iteration until all tasks are scheduled. A Hybrid Simulated Annealing(HSA) can be constructed through applying the heuristic to generate initial schedule,choosing the swap neighborhood strcture and insertion neighborhood structure to obtain neighbor schedule, and employing the revised forward recursion algorithm to compute objective function value.Numerical experiments are conducted to show that the proposed HSA performs well with respect to accuracy and efficiency of solution.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号