首页> 外文期刊>中国海洋工程(英文版) >Estimation of Bed Shear Stresses in the Pearl River Estuary
【24h】

Estimation of Bed Shear Stresses in the Pearl River Estuary

机译:珠江河口床剪应力估算

获取原文
获取原文并翻译 | 示例
       

摘要

Mean and fluctuating velocities were measured by use of a pulse coherent acoustic Doppler profiler(PC-ADP) and an acoustic Doppler velocimeter in the tidal bottom boundary layer of the Pearl River Estuary.The bed shear stresses were estimated by four different methods:log profile(LP),eddy correlation(EC),turbulent kinetic energy(TKE),and inertial dissipation(ID).The results show that(a) all four methods for estimating bed stresses have advantages and disadvantages,and they should be applied simultaneously to obtain reliable frictional velocity and to identify potential sources of errors;(b) the LP method was found to be the most suitable to estimate the bed stresses in non-stratified,quasi-steady,and homogeneous flows;and(c) in the estuary where the semi-diurnal tidal current is dominant,bed shear stresses exhibit a strong quarter-diurnal variation.

著录项

  • 来源
    《中国海洋工程(英文版)》 |2015年第1期|133-142|共10页
  • 作者

    刘欢; 吴加学;

  • 作者单位
  • 收录信息 中国科学引文数据库(CSCD);中国科技论文与引文数据库(CSTPCD);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 04:48:07
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号