The feed water control plan of CCS is analyzed and optimized using the example of first phase project 2×660MW supercritical unit of Xuangang power plant.The problem of mismatch of feed water pump and hydraulic coupler are analyzed.The feed water control plan based on fuzzy adaptive PID is proposed.%以轩岗电厂一期工程2×660MW超临界机组为例,对CCS中给水控制方案进行分析、优化,分析给水泵和液力耦合器不匹配的问题,提出了基于模糊自适应PID的给水控制方案。