首页> 中文期刊> 《建筑技术》 >超高层导轨式爬架安全施工技术

超高层导轨式爬架安全施工技术

         

摘要

Truss track climbing scaffold construction technique is adopted in the dispatching and communication building project. Truss track climbing scaffold is composed of the following four parts, including scaffold, lifting and bearing structure, and -inclination and anti -dropping device, power control system. Successful application of installation, protection, lifting and dismantlement techniques of trass track climbing scaffold ensures the engineering quality and expected economic and social benefits are obtained.%调度通讯楼工程采用桁架导轨式爬架施工技术.桁架导轨式爬架由架体、升降承力结构、防倾防坠装置和动力控制系统四部分构成.通过桁架导轨式爬架安装、防护、升降、拆除技术的应用,保证了工程质量,取得了预想中的经济效益及社会效益.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号