首页> 外文学位 >Implementing Temporary LED Construction Lighting.
【24h】

Implementing Temporary LED Construction Lighting.

机译:实施临时LED建筑照明。

获取原文
获取原文并翻译 | 示例

摘要

LED lighting technology is continuing to grow and change every 6 months. While other manufacturers and consumers are finding creative ways to implement them in their products and everyday life, the construction industry has yet to widely adopt and embrace the technology as a temporary lighting source on their projects. Although initially expensive when compared with other construction lighting systems, the cost of LEDs is decreasing while improvements in LED luminaire efficiency increases. Furthermore, the energy, maintenance, and safety benefits of a temporary LED lighting system may be an overlooked consideration for general contractors and subcontractors as (1) the information has yet to be thoroughly studied and targeted at the construction industry, (2) initial costs of entry may be prohibitive when compared with older sources of luminance, and/or (3) general contractors and subcontractors may be satisfied with the status quo.;Unfortunately, improvements in temporary lighting technology for building construction have been neglected academically and within the construction industry. However, the objective of this thesis is to serve as a guide by looking at the safety, energy and maintenance benefits of LED construction lighting, through literature review, lessons learned from two case studies, and independent investigation by the author.;Literature review will provide a background on how LEDs work, what traditional lighting is, who regulates quality of luminance on jobsites, and how lighting affects the safety and health of workers.;Next, the thesis incorporates two case studies, both of which were conducted at the behest of the University of Washington's (UW) Capital Planning and Development office (CPD). The first case study was generated in 2014. The study, written by UW Construction Management graduate student Yi Jie Huang, focused on the temporary construction lighting at the UW's Bothell Phase 3 Project. The report looks at: (1) the system's installation method; (2) labor, material, and energy cost; (3) stakeholder interviews; and (4) a qualitative survey of the workers.;The second case study, written by UW Construction Management and Occupational Safety and Health graduate student Christopher Mak, further updates the UW's narrative on LED lighting, and illustrates the history and reasoning behind implementing low-voltage LEDs on their projects. The report homes in on the LED utilization at the UW's Animal Research and Care Facility (ARCF) construction site. Like the report on the Bothell Phase 3 project, the second case study looks at: (1) installation method; (2) labor, material, and energy costs; and (3) conducts a qualitative survey of workers. Finally, the author ran three quantitative studies looking at light levels, energy use, and lighting quality. Data collected is displayed and interpreted within.;The final issue the author looks at is the possibility of glare, which arose during qualitative data analysis of both case studies' responses. Glare emanating from white LEDs is a potential safety hazard and an environmental quality problem. Moreover, defining hazardous amounts of glare can be subjective and hard to quantify. The author implements a glare quantifying methodology using HDR photography, and uses the technique to gauge the quality of light emanating from ARCF's new LEDs.;The thesis concludes with lessons learned regarding how users can better implement temporary LED lighting to their full benefit from the trials and tribulations experienced by the UW, observations made by the author, and from the Seattle City Light inspection and energy incentive process.
机译:LED照明技术每6个月不断增长和变化。尽管其他制造商和消费者正在寻找在其产品和日常生活中实现它们的创新方法,但建筑行业尚未广泛采用并接受该技术作为其项目中的临时照明源。尽管最初与其他建筑照明系统相比价格昂贵,但LED的成本却在下降,而LED照明器效率的提高却在增加。此外,临时LED照明系统在能源,维护和安全方面的好处对于总承包商和分包商而言可能是一个被忽略的考虑因素,因为(1)信息尚待深入研究并针对建筑行业,(2)初始成本与较旧的亮度源相比,进入建筑可能会被禁止,和/或(3)总承包商和分包商可能对现状感到满意;;不幸的是,学术上和建筑内部都忽略了建筑临时照明技术的改进行业。然而,本文的目的是通过文献综述,从两个案例研究中吸取的教训以及作者的独立研究,来研究LED建筑照明的安全性,能源和维护效益,以作为指导。提供有关LED如何工作,传统照明是什么,谁在现场调节照明质量以及照明如何影响工人安全和健康的背景。;接下来,本文结合了两个案例研究,这两个案例均是根据要求进行的。华盛顿大学(UW)首都规划和发展办公室(CPD)的总部。第一个案例研究产生于2014年。该研究由西澳大学建筑管理系研究生黄逸杰(Yi Jie Huang)撰写,侧重于西澳大学的Bothell三期项目的临时建筑照明。该报告着眼于:(1)系统的安装方法; (2)人工,材料和能源成本; (3)利益相关者访谈; (4)对工人的定性调查。;第二个案例研究,由西澳大学建筑管理和职业安全与健康研究生克里斯托弗·麦(Christopher Mak)撰写,进一步更新了西澳大学关于LED照明的叙述,并说明了实施低能耗照明的历史和原因。项目上的高电压LED。该报告介绍了西澳大学动物研究与关怀设施(ARCF)施工现场的LED利用率。就像博塞尔三期项目的报告一样,第二个案例研究着眼于:(1)安装方法; (2)人工,材料和能源成本; (3)对工人进行定性调查。最后,作者进行了三项定量研究,研究了照明水平,能源使用和照明质量。收集的数据将在其中显示和解释。作者要研究的最后一个问题是眩光的可能性,这是在对两个案例研究的响应进行定性数据分析时出现的。白光LED发出的眩光是潜在的安全隐患和环境质量问题。而且,定义危险的眩光量可能是主观的并且难以量化。作者使用HDR摄影技术实现了眩光量化方法,并使用该技术对ARCF新型LED发出的光的质量进行了评估。本文的结论是关于用户如何更好地利用临时LED照明以充分利用试验的经验教训和华盛顿大学所经历的苦难,作者的观察以及西雅图市的光检查和能源激励过程。

著录项

  • 作者

    Mak, Christopher.;

  • 作者单位

    University of Washington.;

  • 授予单位 University of Washington.;
  • 学科 Civil engineering.;Occupational safety.
  • 学位 Masters
  • 年度 2017
  • 页码 145 p.
  • 总页数 145
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:38:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号