首页> 外文学位 >Planners and the pork barrel: Metropolitan engagement in and resistance to congressional transportation earmarking.
【24h】

Planners and the pork barrel: Metropolitan engagement in and resistance to congressional transportation earmarking.

机译:计划者和猪肉桶:大都市参与并抵制国会交通的指定用途。

获取原文
获取原文并翻译 | 示例

摘要

Since passage of the 1991 Intermodal Surface Transportation Efficiency Act (ISTEA), U.S. transportation policy has gradually strengthened metropolitan authority over federal transportation investments. Federal law requires metropolitan planning organizations (MPOs)---composed of local elected officials, transportation agency leaders, and public stakeholders---to plan and program federally funded improvements in urban regions. Yet members of the U.S. Congress have increasingly used funding bills to "earmark" funds to specific transportation projects. Derogatively called pork barreling, the practice can transfer discretion over transportation finance from metropolitan officials to members of Congress, who may hand-pick projects for funding whether or not they reflect regional transportation needs or priorities articulated in their MPOs' long range plans (LRPs) or transportation improvement programs (TIPs).This dissertation maps how Congressional earmarking of federal funds interacts with the metropolitan transportation planning process for programming federal investments. It examines what happens to metropolitan planning and the MPOs responsible for that process when Congress earmarks projects. The study draws on 90 original interviews of representatives of metropolitan, state, and federal transportation organizations national groups and policy organizations Congressional committee staff and other transportation experts. The study also reviews transportation authorization and appropriation bills, government reports, industry and policy newsletters, as well as statistical data about earmarks from government agencies and public interest organizations. Finally, to evaluate two different MPOs' experiences with earmarking, the dissertation presents cases studies of the Dallas-Fort Worth and New York MPOs.This study shows that planning relevant information can come quite close to the selection process for earmarks. It also documents the organizational routines and strategies, many rooted in ISTEA provisions like fiscal constraint, that MPOs and state transportation departments have established to influence earmarks beforehand or to manage earmarks post hoc when they threaten to disrupt regional commitments. Despite these measures, Congressional earmarking often overrides the very planning processes that Congress itself requires of metropolitan areas and states seeking federal transportation funds. By redistributing federal transportation dollars and unsettling planning expectations, earmarking undercuts MPOs and their institutionalization in metropolitan areas precisely when federal policy may further expand MPOs' responsibilities.
机译:自1991年《多式联运地面运输效率法》(ISTEA)通过以来,美国的交通政策逐渐加强了大都市对联邦交通投资的权威。联邦法律要求由当地民选官员,运输机构领导人和公共利益相关者组成的城市规划组织(MPO),对城市地区由联邦政府资助的改善工作进行规划和规划。然而,美国国会议员越来越多地使用资助法案来“专用”于特定运输项目的资金。这种做法被贬义为“猪肉桶装”,它可以将运输资金的酌处权从大都会官员转移到国会议员,国会议员可以亲自挑选项目资金,无论它们是否反映了地区交通需求或MPO长期计划(LRP)中阐明的优先事项。这篇论文描绘了国会指定联邦资金如何与大都会交通规划过程相互影响,以对联邦投资进行编程。它研究了国会指定专案时大都会规划以及负责该过程的MPO会发生什么情况。该研究借鉴了大都会,州和联邦交通运输组织,国家团体和政策组织,国会委员会的工作人员以及其他交通运输专家的90次原始访谈。该研究还审查了运输授权和拨款法案,政府报告,行业和政策新闻通讯,以及来自政府机构和公共利益组织的专用统计数据。最后,为了评估两种不同的MPO在指定用途方面的经验,本文以Dallas-Fort Worth和New York MPO的案例研究为例。该研究表明,规划相关信息可以非常接近指定用途的选择过程。它还记录了组织惯例和策略,其中许多根植于ISTEA规定,例如财政约束,MPO和州交通部门已经建立了这种惯例和策略,可以事先影响专款,或在威胁破坏地区承诺时事后管理专款。尽管采取了这些措施,但国会指定用途的预算往往会超出国会本身对于大城市地区和各州寻求联邦交通基金所需的规划程序。通过重新分配联邦运输资金和使计划期望不安,专款专用于削弱MPO及其在大都市地区的制度化,恰好是在联邦政策可能进一步扩大MPO职责的情况下。

著录项

  • 作者

    Sciara, Gian-Claudia.;

  • 作者单位

    University of California, Berkeley.;

  • 授予单位 University of California, Berkeley.;
  • 学科 Political Science General.Urban and Regional Planning.Transportation.
  • 学位 Ph.D.
  • 年度 2009
  • 页码 405 p.
  • 总页数 405
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号