首页> 外文学位 >Asset turn-in Lean Six Sigma project for White Sands Test Center, Department of the Army.
【24h】

Asset turn-in Lean Six Sigma project for White Sands Test Center, Department of the Army.

机译:陆军部白沙测试中心的资产上交精益六西格玛项目。

获取原文
获取原文并翻译 | 示例

摘要

The White Sands Test Center, located on White Sands Missile Range in Southern New Mexico, conducts numerous missions in support of the Army and other Department of Defense customers. Performing these missions requires an enormous amount of non-expendable equipment that has to be accounted for through a hand receipt process. Over the years, much of this equipment had become obsolete or unserviceable but had not been turned in for proper supply management. Consequently, the amount of equipment on hand was not effectively documented or tracked.;This project used the Lean Six Sigma (LSS) Define-Measure-Analyze-Improve-Control (DMAIC) process to improve asset accountability. The process of turning in excess equipment was evaluated. The project included personnel from the White Sands Test Center and the Directorate of Logistics. The project increased the number of turn-in items by 90% and the Sigma Quality Level (SQL) of the process was increased from 1.5 to 1.773.
机译:位于新墨西哥州南部的白沙导弹靶场上的白沙测试中心承担着众多任务,以支持陆军和其他国防部客户。执行这些任务需要使用手工收货流程解决的大量非消耗性设备。多年以来,许多此类设备已陈旧或无法使用,但尚未上交以进行适当的供应管理。因此,现有设备的数量没有得到有效的记录或跟踪。;该项目使用了精益六西格玛(LSS)的定义-度量-分析-改进-控制(DMAIC)流程来改善资产责任制。对上交多余设备的过程进行了评估。该项目包括白沙测试中心和后勤局的人员。该项目将上交项目的数量增加了90%,该过程的Sigma质量等级(SQL)从1.5提高到1.773。

著录项

  • 作者

    Costa, Karen Marie.;

  • 作者单位

    California State University, Dominguez Hills.;

  • 授予单位 California State University, Dominguez Hills.;
  • 学科 Engineering General.
  • 学位 M.S.
  • 年度 2014
  • 页码 124 p.
  • 总页数 124
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 现代史(1917年~);
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号