OVERTOPPING RISK EVALUATION FOR AN EXISTING DAM.

机译:现有大坝的过度风险评估。

获取原文
获取原文并翻译 | 示例

摘要

A probability-based methodology to evaluate quantitatively and systematically the overtopping risk of dams is formulated. This study considers mainly the overtopping induced by occurrences of flood and wind. Risk models for overtopping consist of fault tree analysis and random process modelling of the flood, wind, and other geophysical forces. A load combination model is established to account for the combined effects resulting from concurrence of flood and wind. A complete procedure for evaluating the risk of overtopping induced by flood and wind including a detailed uncertainty analysis of relevant parameters is presented. The methodology can be generalized to consider other conditions affecting dam safety.;A medium sized earth dam located in northern Illinois is used as an example to demonstrate how to evaluate the risk of overtopping over a given period of time interval using the proposed risk model and procedure. Overtopping risk evaluated using the normal pool level of the reservoir together with an inflow flood generated by a 24-hour rainfall, which is the current practice of the U.S. dam safety inspection program, is found to be conservative.;Four risk computation techniques are studied and compared; namely, direct integration method, Monte Carlo simulation method, mean-value first-order second-moment method, and advanced first-order second-moment method. The advanced first-order second-moment method, which linearizes the Taylor series expansion of the performance function at the failure point, and utilizes the first and second moments of the component variables, is shown to be the preferred one at present for risk evaluation of dams.
机译:提出了一种基于概率的方法,可以定量和系统地评估水坝的超车风险。本研究主要考虑由洪水和风灾引起的过顶现象。覆盖的风险模型包括故障树分析和洪水,风和其他地球物理力的随机过程建模。建立了负荷组合模型,以考虑洪水和风灾的并发产生的综合影响。提出了评估洪水和风灾引起的翻倒风险的完整程序,包括有关参数的详细不确定性分析。可以将该方法综合考虑其他影响大坝安全的条件。以伊利诺伊州北部的中型土坝为例,说明如何使用建议的风险模型评估给定时间间隔内的翻倒风险。程序。使用美国大坝安全检查计划的当前实践,使用水库的正常池水位以及由24小时降雨产生的流入洪水评估的过顶风险被认为是保守的。研究了四种风险计算技术并进行比较;即直接积分法,蒙特卡罗模拟法,均值一阶二阶矩法和高级一阶二阶矩法。先进的一阶二阶矩方法可以线性化失效点处性能函数的泰勒级数展开,并利用成分变量的一阶和二阶矩,目前被认为是风险评估的首选方法。水坝。

著录项

  • 作者

    CHENG, SHUI-TUANG.;

  • 作者单位

    University of Illinois at Urbana-Champaign.;

  • 授予单位 University of Illinois at Urbana-Champaign.;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 1982
  • 页码 214 p.
  • 总页数 214
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号