首页> 外文学位 >Swamp Timothy production response to a modified hydrology in wetlands of the grassland ecological area.
【24h】

Swamp Timothy production response to a modified hydrology in wetlands of the grassland ecological area.

机译:蒂莫西沼泽的生产对草原生态区湿地水文学变化的响应。

获取原文
获取原文并翻译 | 示例

摘要

Habitat restoration efforts involve the risk of imposing negative effects on adjacent ecosystems. Investigations in adaptive management strategies can assist in determining the magnitude of risk associated with restoration strategies. The Lower San Joaquin River (LSJR) can experience very low flow conditions, offering little to no flows to dilute LSJR watershed drainage in critically dry years. The Central Valley Regional Water Quality Control Board has adopted a conditional waiver of Waste Discharge Requirement for discharges from irrigated lands, which requires the characterization of wetland water quality, and a salt and boron Total Maximum Daily Load, limiting the amount of salt and boron that can be discharged into the San Joaquin River at times of limited assimilative capacity. Wetland managers are being asked to modify their normal water management by draining wetlands to match sufficient assimilative capacity in the LSJR to dilute saline drainage discharges to meet load allocations. Wetland managers are concerned that altering the normal hydrology in managed wetlands will adversely impact the productivity of these wetlands over time. A drainage strategy that has been proposed is a 4-6 week delay in drainage of wetlands managed for swamp timothy. The schedule of the delay drawdown was chosen to coincide with capacity in the LSJR associated with the State Water Resource Control Board's Vernalis Adaptive Management Program, VAMP. Twelve impoundments from six properties were selected to represent the spectrum of swamp timothy managed wetlands in the GEA. Treatment fields from each property were randomly selected to undergo a 4-6 week delay in spring drawdown and a subsequent lack of irrigation. The remaining six control fields were managed normally with a mid March drawdown and normal 4 week post drawdown irrigation. Despite the large variation found in annual swamp timothy seed and biomass production a significant treatment by time interaction was observed using a repeated measures analysis. Although a reduction in seed and biomass yield was observed in many fields over the study duration due to natural year to year production variation, delayed drawdown treatment fields declined to a greater magnitude than normally managed control fields at all properties.
机译:人居恢复工作涉及对邻近生态系统造成负面影响的风险。对适应性管理策略的调查可以帮助确定与恢复策略相​​关的风险大小。下圣华金河(LSJR)的流量极低,在极端干旱的年份几乎没有流量能稀释LSJR流域的排水。中央河谷地区水质控制委员会已经有条件地免除了灌溉土地排放的废物排放要求,这要求表征湿地的水质,并规定盐和硼的总最大日负荷量,限制了盐和硼的含量可以在同化能力有限的时候排入圣华金河。要求湿地管理者通过排干湿地来改变其正常水管理,以匹配LSJR中足够的同化能力,以稀释盐水排泄物以满足负荷分配。湿地管理者担心,随着时间的流逝,改变管理湿地的正常水文状况会对这些湿地的生产力产生不利影响。已提出的排水策略是为沼泽地治理而将湿地排水延迟4-6周。选择延后延期的时间表,使其与与州水资源控制委员会的Vernalis适应性管理计划VAMP相关的LSJR的能力相吻合。从六个属性中选择了十二个蓄水池,以代表GEA中沼泽地提摩提管理的湿地的频谱。随机选择每个属性的处理场,以在春季降水和随后缺乏灌溉的情况下延迟4-6周。其余六个控制田通常在3月中旬灌溉和灌溉后4周正常灌溉。尽管在年度沼泽提摩太种子和生物量生产中发现了很大的差异,但是使用重复测量分析发现了通过时间相互作用的显着处理。尽管由于自然年度产量变化,在研究期间许多田地的种子和生物量产量均下降,但延迟放水处理田地在所有特性上的下降幅度均比正常管理的田地大。

著录项

  • 作者

    Ortega, Ricardo.;

  • 作者单位

    University of California, Davis.;

  • 授予单位 University of California, Davis.;
  • 学科 Biology Ecology.
  • 学位 M.S.
  • 年度 2009
  • 页码 119 p.
  • 总页数 119
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号