首页> 外文学位 >Formulation and implementation of a large-scale work scheduling algorithm for underground coal mines.
【24h】

Formulation and implementation of a large-scale work scheduling algorithm for underground coal mines.

机译:地下煤矿大规模工作调度算法的制定与实现。

获取原文
获取原文并翻译 | 示例

摘要

The assignment of available workers to prioritized jobs on a shift basis is one of the most important and difficult decisions for the managers of underground coal mines. The objective of this study was to develop a work scheduling algorithm to handle the worker assignment problem in an efficient and practical way.;The study basically consisted of three parts. The first part concerned the development of a mathematical programming model to handle the worker assignment problem. A goal programming model was developed first, and was converted a zero-one linear programming model which allows more flexibility in coping with various situations of the worker assignment problem in underground coal mines.;The second part aimed at achieving an efficient solution of the model. This included data manipulation for efficient input of technical coefficients that were developed using expert knowledge and development of an efficient method for solving the problem. Two different methods, the branch-and-bound method and the additive algorithm, were used to solve the problem. The results indicated that the additive algorithm only works for small problems. The branch-and-bound method will result in memory shortage and give very slow solution when solving large-scale problems. Thus, special attention should be given by a user to the manpower requirement structure so that the solution from simplex method can be integer and a quick solution of worker assignments can be achieved.;The third part of the study implemented the work scheduling algorithm to the worker assignment problem at the Martinka mine. Through the implementation, some other practical considerations, associated with the utilization of workers, were addressed by adjusting the model. The results showed that the work scheduling algorithm can make optimal assignments of workers to prioritized jobs in a reasonably short time, even for a large underground coal mine.;In conclusion, it is believed that this work scheduling algorithm has potential significance in increasing manpower utilization and can offer great help to coal mine managers in making efficient manpower allocations.
机译:对于地下煤矿的管理者而言,轮班安排可用工人分配优先工作是最重要和困难的决定之一。这项研究的目的是开发一种工作调度算法,以有效,实用的方式解决工人的分配问题。研究主要由三个部分组成。第一部分涉及用于处理工人分配问题的数学编程模型的开发。首先开发了目标规划模型,然后将其转换为零一线性规划模型,该模型可以更灵活地应对地下煤矿工人分配问题的各种情况。第二部分旨在实现模型的有效解决方案。 。这包括使用专家知识开发的用于有效输入技术系数的数据处理方法,以及解决问题的有效方法的开发。解决了该问题,使用了两种不同的方法:分支定界法和加性算法。结果表明,加性算法仅适用于小问题。分支定界方法将导致内存不足,并且在解决大规模问题时会给出非常慢的解决方案。因此,用户应特别注意人力需求结构,以使单纯形法的解可以是整数,并可以快速解决工人分配问题。马丁卡矿的工人分配问题。通过实施,通过调整模型解决了与工人利用相关的其他一些实际考虑。结果表明,即使在大型地下煤矿中,该工作调度算法也可以在较短的时间内对工人进行优先任务的优化分配;总而言之,该工作调度算法对于提高人力利用率具有潜在的意义。并可以为煤矿经理提供有效的人力分配方面的巨大帮助。

著录项

  • 作者

    Yuan, Shiquan.;

  • 作者单位

    West Virginia University.;

  • 授予单位 West Virginia University.;
  • 学科 Mining engineering.;Operations research.
  • 学位 Ph.D.
  • 年度 1992
  • 页码 157 p.
  • 总页数 157
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号