The main objective of this research is to develop a methodology for construction coordination. This methodology is named the Integrated Construction Coordination Change Response System (ICCCRS). The specific focus of the research in coordination is response to change situations.;The response to change is a great challenge to effective construction coordination. ICCCRS employs an expert system to represent the empirical knowledge of a construction coordinator. A group of project databases is controlled by part of this expert system. Through this arrangement, the coordinator can access information regarding the construction project. The information is used in making decisions about the response to a change situation.;The expert system uses an object orientation for its representation. The knowledge is represented as a class hierarchy. The hierarchy is built upon the view that the construction effort is based on resource use. Resources are the basic building blocks for the activities in a construction project.;The methodology is able to detect changes in the status of the project resources. The response options are evaluated using decision factors comparable to those the coordinator would use. Fuzzy logic evaluation of the response options yields an ordered option list. The coordinator then decides on a response from this list.;The ICCCRS methodology was tested using a prototype system. The prototype is implemented using the C Language Integrated Production Rule System (CLIPS) software. The verification of the CLIPS modules was done by hand calculation. The results were validated by checking the output with expected decisions.;Decisions were based on the value of the decision factors during the inference. ICCCRS is the first step toward the improvement of the construction coordination process.
机译:这项研究的主要目的是开发一种施工协调方法。这种方法被称为综合施工协调变更响应系统(ICCCRS)。协调研究的重点是对变化情况的响应。对变化的响应是有效的施工协调的巨大挑战。 ICCCRS采用专家系统来代表建筑协调员的经验知识。一组项目数据库由该专家系统的一部分控制。通过这种安排,协调员可以访问有关建设项目的信息。该信息用于决策对变化情况的响应。专家系统使用面向对象的表示方式。知识表示为类层次结构。该层次结构基于以下观点:构建工作是基于资源使用的。资源是建筑项目中活动的基本构建块。方法论能够检测项目资源状态的变化。使用与协调员将使用的决策因子相当的决策因子来评估响应选项。响应选项的模糊逻辑评估会生成有序选项列表。然后,协调员从该列表中决定响应。ICCCRS方法论已使用原型系统进行了测试。该原型是使用C语言集成生产规则系统(CLIPS)软件实现的。 CLIPS模块的验证是通过手工计算完成的。通过用预期决策检查输出来验证结果。决策基于推断过程中决策因素的值。 ICCCRS是改进施工协调流程的第一步。

著录项

  • 作者

    Milligan, Charles Edward.;

  • 作者单位

    Texas A&M University.;

  • 授予单位 Texas A&M University.;
  • 学科 Civil engineering.;Artificial intelligence.
  • 学位 Ph.D.
  • 年度 1992
  • 页码 266 p.
  • 总页数 266
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号