首页> 外文学位 >Engineering and economic risk assessment for longwall coal mining systems.
【24h】

Engineering and economic risk assessment for longwall coal mining systems.

机译:长壁采煤系统的工程和经济风险评估。

获取原文
获取原文并翻译 | 示例

摘要

As the longwall mining method enjoys increasing success in a wide variety of coal seams around the world, new operators acquire their first longwall faces at an increasing rate. The large economic investment associated with this acquisition decision, approaching ;Application of the technique to three case-studies yielded several notable conclusions. First and foremost, it is evident that traditional deterministic project valuation techniques may overvalue projects by more than 60%. Further, it was shown that the outcome distributions are asymmetric with a negative-skew. Non-linear impacts were associated with approximately 50 percent of the identified project parameters, accounting for the previously noted negative-skew in the NPV outcome distributions for longwall coal mining projects. Conclusions are also made about risk management for longwall mining projects.
机译:随着长壁开采方法在全球各种煤层中获得越来越大的成功,新的运营商以越来越高的速度获得了他们的第一张长壁工作面。与此收购决策相关的巨大经济投资接近;将该技术应用于三个案例研究得出了几个值得注意的结论。首先,最明显的是,传统的确定性项目评估技术可能会使项目高估60%以上。此外,结果表明结果分布是不对称的,具有负偏斜。非线性影响与大约50%的已确定项目参数相关,这说明了以前提到的长壁采煤项目NPV结果分布中的负偏斜。还得出关于长壁开采项目风险管理的结论。

著录项

  • 作者

    Bessinger, Stephen L.;

  • 作者单位

    West Virginia University.;

  • 授予单位 West Virginia University.;
  • 学科 Mining engineering.;Commerce-Business.;Operations research.
  • 学位 Ph.D.
  • 年度 1993
  • 页码 238 p.
  • 总页数 238
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号