首页> 外文学位 >A study of sequencing strategy for steep, tabular, hardrock orebodies.
【24h】

A study of sequencing strategy for steep, tabular, hardrock orebodies.

机译:陡峭,板状,硬岩矿体的测序策略研究。

获取原文
获取原文并翻译 | 示例

摘要

This thesis reviews, analyses and classifies extraction methods and sequences used in steep, tabular orebodies in Ontario hardrock mines and how new bulk mining techniques have affected them.;The thesis examines, as a case study, the complexities of sequencing the extraction of the Hemlo orebody through three adjacent mines and details the planning and monitoring of extracting one section of the David Bell orebody. It examines the use of numerical modelling as a tool in extraction sequence planning and demonstrates how, in conjunction with an instrumentation program, the results assist successful completion of the plan.;The thesis concludes that bulk mining sequences have increased resource extraction and productivity, lowered costs and improved ground control aspects of extraction planning; but have compromised grade control. This aspect should be improved to maximize the economic benefits. In addition, as automated or continuous mining methods are developed, their benefits should be analyzed in the context of overall sequence planning objectives.
机译:本文回顾,分析和分类了安大略硬岩矿山陡峭板状矿体中使用的提取方法和顺序,以及新的批量开采技术如何影响它们。作为案例研究,本文研究了Hemlo提取顺序的复杂性。矿体穿过三个相邻的矿山,并详细描述了开采大卫·贝尔矿体的一部分的计划和监控。它审查了数值建模作为提取序列计划工具的用途,并演示了结果如何与仪器程序结合使用,以帮助计划的成功完成。开采计划的成本和改进的地面控制方面;但影响了成绩控制。这方面应加以改进,以使经济利益最大化。另外,随着自动或连续采矿方法的发展,应在总体序列计划目标的背景下分析其益处。

著录项

  • 作者

    Pelley, Charles Whitfield.;

  • 作者单位

    McGill University (Canada).;

  • 授予单位 McGill University (Canada).;
  • 学科 Mining engineering.
  • 学位 Ph.D.
  • 年度 1994
  • 页码 342 p.
  • 总页数 342
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号