首页> 外文学位 >Electric power auction market implementation and simulation.
【24h】

Electric power auction market implementation and simulation.

机译:电力拍卖市场的实施与仿真。

获取原文
获取原文并翻译 | 示例

摘要

This work is motivated by the recent changes in regulatory policies towards inter utility-power interchange practices. If competition replaces regulation as the norm of electric power generation and bulk power supply, a number of changes would be required. The NOPR proposes unbundling the utility companies into: Genco (generation company), Transco (transmission company), and disco (distribution company). A central coordinating body is called RTG in FERC's 1993 NOPR.; This work has developed the foundation for market-based pricing of ancillary services in electric power transaction. It is used to design an auction market simulator.; The developed brokerage model provides a unified framework for merchandising and technical functions. This provides better coordination among the market participants as opposed to two-tier models.; Reserve margins and transmission losses are included to design an efficient pricing mechanism for providing correct incentives to achieve a reliable electric market place. The proposed mathematical framework is close to traditional optimal power flow problem. The developed formulation can be adapted for linear programming. The formulation has angular block structure which can be exploited to apply efficient decomposition techniques to solve a large scale power system problem.; The foundation is used to develop an automatic generation control (AGC) simulator and an electric power auction market simulator for a price-based system operation. The proposed scheme greatly improves control signals to unit dispatch and controllers. It includes ACE as a part of control error signal.; In the new environment. the plant operators are required to submit the price-based bids to perform electric power transaction. This is quite different from what the system operators are accustomed in a vertically integrated industry. The proposed simulator can be used as a tool to train operators how to bid.; The tool described should enable the analysis of proposed rules for the new environment. Issues, such as pricing of transmission losses, priority of transactions, emergency power, etc. can be studied. (Abstract shortened by UMI.)
机译:这项工作的动力是最近针对公用事业-电力互换实践的监管政策的变化。如果竞争取代法规作为发电和大容量电源的规范,则将需要进行许多更改。 NOPR建议将公用事业公司分为以下几类:Genco(发电公司),Transco(输电公司)和disco(配电公司)。中央协调机构在FERC 1993年NOPR中称为RTG。这项工作为电力交易中基于辅助服务的市场定价奠定了基础。它用于设计拍卖市场模拟器。发达的经纪模式为销售和技术功能提供了统一的框架。与两层模型相比,这可以在市场参与者之间提供更好的协调。包括储备保证金和输电损失,以设计一种有效的定价机制,以提供正确的激励措施,以实现可靠的电力市场。所提出的数学框架接近于传统的最优潮流问题。所开发的公式可适用于线性编程。该配方具有角块结构,可以利用角块结构来应用有效的分解技术来解决大规模电力系统问题。该基金会用于开发基于价格的系统操作的自动发电控制(AGC)仿真器和电力拍卖市场仿真器。所提出的方案极大地改善了对单元调度和控制器的控制信号。它包括ACE作为控制错误信号的一部分。在新环境中。工厂运营商需要提交基于价格的投标书以执行电力交易。这与垂直集成行业中系统操作员的习惯大不相同。拟议的模拟器可以用作培训运营商如何出价的工具。所描述的工具应能够分析针对新环境的建议规则。可以研究诸如传输损耗的定价,交易的优先级,应急电源等问题。 (摘要由UMI缩短。)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号