首页> 外文学位 >Travels from flatland: The Walt Disney Concert Hall and the specialization of design knowledge in the building sector.
【24h】

Travels from flatland: The Walt Disney Concert Hall and the specialization of design knowledge in the building sector.

机译:从平地旅行:沃尔特迪斯尼音乐厅和建筑领域的设计知识专业化。

获取原文
获取原文并翻译 | 示例

摘要

This thesis is a study of the distribution of design expertise in the U.S. building process, and the implications of its evolving patterns for architectural work and practice. It stems from the idea that a process of knowledge specialization, and parallel fragmentation of responsibilities, is well under way in the building industry, and may affect the form of the design process, the function of the architect within it, the structure of the architectural office, and the nature of the employment.;To reflect on these issues, the dissertation examines the composition of the project team assembled for one of Frank O. Gehry's major projects, the Walt Disney Concert Hall in Los Angeles. The analysis highlights the network of design contributions, and the roles fulfilled by different types of consultants and trade specialists vis-a-vis the 'core' team of architects and engineers.;After likening the building process to a 'system of design production,' I show that the organization of the specific project can be read in light of economic concepts normally employed by the literature on production systems. Through a review of the market of each project participant, I then prove that the allocation of responsibilities for Disney Hall is consistent with the way design knowledge and services are supplied in the building industry. Despite its apparent uniqueness, the case study can be considered an ideal-typical representation of how the design sector organizes.;Borrowing from industrial restructuring and labor critique, the thesis brings up and discusses the various implications of this situation. These include practical aspects--such as the reduction of the technical gap between architectural firms, the possible reorganization of the market of design services, and the importance of addressing the relation between architect and specialists--but also more substantial issues, like the need for a conceptual re-formulation of "building design" and a careful reconsideration of the notion of "professionalism.".
机译:本论文研究了美国建筑过程中设计专业知识的分布,以及其不断发展的模式对建筑工作和实践的影响。它源于这样的想法,即知识专业化和职责并行化的过程在建筑行业中正在良好地进行,并且可能影响设计过程的形式,其中的建筑师的功能,建筑的结构为了反思这些问题,本文研究了为弗兰克·O·盖里的主要项目之一,洛杉矶的沃尔特·迪斯尼音乐厅而组建的项目团队的组成。分析强调了设计贡献的网络,以及不同类型的顾问和贸易专家相对于建筑师和工程师的``核心''团队所扮演的角色;在将建造过程比作``设计生产系统''之后,我表明,可以根据生产系统文献中通常采用的经济概念来阅读特定项目的组织。通过回顾每个项目参与者的市场,我然后证明迪士尼音乐厅的职责分配与建筑业提供设计知识和服务的方式一致。尽管案例研究具有明显的独特性,但它仍可以看作是设计部门如何组织的理想典型代表。借鉴产业结构调整和劳工批判,本文提出并讨论了这种情况的各种含义。其中包括实践方面的问题,例如缩小建筑公司之间的技术差距,可能重组设计服务市场以及解决建筑师与专家之间关系的重要性等,但也包括一些更实质性的问题,例如需求对“建筑设计”进行概念上的重新表述,并对“专业主义”的概念进行认真的重新考虑。

著录项

  • 作者

    Tombesi, Paolo.;

  • 作者单位

    University of California, Los Angeles.;

  • 授予单位 University of California, Los Angeles.;
  • 学科 Architecture.
  • 学位 Ph.D.
  • 年度 1997
  • 页码 330 p.
  • 总页数 330
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号