首页> 外文学位 >Integrated product team (IPT) implementation for managing a satellite ground system.
【24h】

Integrated product team (IPT) implementation for managing a satellite ground system.

机译:集成产品团队(IPT)实施,用于管理卫星地面系统。

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this study was to document the transition of a military organization to an integrated product team (IPT) environment. The first sections of this paper discuss the mission of the organization and the past organizational and contract support structure. The next section describes the current teams and their functions and the members of the IPTs.;Chapter 3 provides historical background on the Department of Defense migration to the IPT and Integrated Product and Process Development (IPPD). Furthermore, qualities, advantages, and applications of cross-functional teams are described in detail.;Analysis methods and the hypothesis are provided in Chapter 4, along with detailed study areas of the hypothesis. Methods used to gather data include a survey and interviews with IPT members.;The results of the analysis, covered in Chapter 5, reveal that the IPT environment has aided teamwork and helped to improve responses for priority tasks. However, there have been several drawbacks in migrating to the IPT environment. Topics discussed include change management, roles and responsibilities, training, succession planning, the IPT charter, leadership and empowerment, and product and process quality.;Chapter 2 discusses the work processes performed in the organization to formally request, provide, and document work. Minor modifications and major modifications are described. Also, the process to resolve network deficiencies is revealed.;Chapter 6 outlines several recommendations to improve the IPT environment and concludes with suggestions for further study.
机译:这项研究的目的是记录军事组织向综合产品小组(IPT)环境的过渡。本文的第一部分讨论组织的任务以及过去的组织和合同支持结构。下一部分描述了当前的团队及其职能以及IPT的成员。第三章提供了国防部向IPT迁移以及集成产品和流程开发(IPPD)的历史背景。此外,还详细描述了跨职能团队的素质,优势和应用。第4章提供了分析方法和假设以及详细的假设研究领域。收集数据的方法包括对IPT成员进行调查和访谈。第5章介绍的分析结果表明IPT环境有助于团队合作并有助于改善对优先任务的反应。但是,迁移到IPT环境存在一些缺点。讨论的主题包括变更管理,角色和职责,培训,继任计划,IPT章程,领导和授权以及产品和过程质量。;第二章讨论了组织中正式请求,提供和记录工作的工作过程。描述了较小的修改和主要的修改。此外,还揭示了解决网络缺陷的过程。第6章概述了一些改进IPT环境的建议,并以进一步研究的建议作为结束。

著录项

  • 作者

    Rudder, Clifford R.;

  • 作者单位

    California State University, Long Beach.;

  • 授予单位 California State University, Long Beach.;
  • 学科 Industrial engineering.;Management.
  • 学位 M.S.
  • 年度 1998
  • 页码 85 p.
  • 总页数 85
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:48:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号