首页> 外文学位 >Build Operate Transfer (BOT) project delivery system in Saudi Arabia.
【24h】

Build Operate Transfer (BOT) project delivery system in Saudi Arabia.

机译:在沙特阿拉伯建立Operate Transfer(BOT)项目交付系统。

获取原文
获取原文并翻译 | 示例

摘要

In Saudi Arabia, financing of large-scale investment projects such as power generation, water desalination, transportation etc has been predominantly undertaken by the Government. But owing to the huge demand for developing new infrastructure including power, water, roads, airports, ports etc as well as rehabilitating the existing infrastructure, private sector participation in the development and operation of infrastructure is now seen as a common and accepted concept. It is estimated that around US {dollar}250 billion will be needed over the next 2 decades to meet existing demand. This thesis presents BOT (Build Operate Transfer) project delivery method for infrastructure development in Saudi Arabia. This study explores the applicability of BOT delivery method in Saudi Arabia. The content analysis was employed to study the feasibility of BOT in Saudi Arabia. The study looks at issues that have an impact, positive or negative on the adopting of BOT. Moreover the study identifies appropriate types of construction projects and markets, which could be possibly implemented through BOT.; The study shows that there is a great potential for application of BOT in Saudi Arabia. An assessment and evaluation of factors conducted in Saudi Arabia proved positive for application of BOT. The results of this research further indicated that power generation and water desalination appear at present to be leading the push for adopting BOT delivery method. Building sufficient local expertise in contractual aspects of BOT, establishment of independent regulator and tariff reform are prerequisite for success of BOT. Finally the thesis presents a model for effective implementation of BOT projects in Saudi Arabia.
机译:在沙特阿拉伯,政府主要承担了大型投资项目的融资,例如发电,海水淡化,运输等。但是,由于对开发包括电力,水,道路,机场,港口等在内的新基础设施的巨大需求,以及修复现有基础设施的需求,私营部门参与基础设施的开发和运营现已被视为一个普遍且公认的概念。据估计,在未来20年中,要满足现有需求,大约需要2500亿美元。本文提出了用于沙特阿拉伯基础设施开发的BOT(构建操作转移)项目交付方法。本研究探讨了BOT交付方式在沙特阿拉伯的适用性。内容分析被用来研究BOT在沙特阿拉伯的可行性。该研究着眼于对采用BOT产生正面或负面影响的问题。此外,该研究还确定了可以通过BOT实施的适当类型的建设项目和市场。研究表明,BOT在沙特阿拉伯有很大的应用潜力。在沙特阿拉伯进行的因素评估和评估证明对实施BOT具有积极意义。这项研究的结果进一步表明,目前发电和海水淡化似乎正在引领采用BOT输送方法的推动。在BOT合同方面建立足够的本地专业知识,建立独立的监管机构和进行关税改革是BOT成功的前提。最后,本文提出了在沙特阿拉伯有效实施BOT项目的模型。

著录项

  • 作者

    Shah, Mohammed Jalaluddin.;

  • 作者单位

    King Fahd University of Petroleum and Minerals (Saudi Arabia).;

  • 授予单位 King Fahd University of Petroleum and Minerals (Saudi Arabia).;
  • 学科 Environmental Sciences.; Engineering Civil.
  • 学位 M.S.
  • 年度 2001
  • 页码 162 p.
  • 总页数 162
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 环境科学基础理论;建筑科学;
  • 关键词