首页> 外文学位 >An Information Systems Project Delivery methodology for implementing Web-based Program Management Systems.
【24h】

An Information Systems Project Delivery methodology for implementing Web-based Program Management Systems.

机译:一种信息系统项目交付方法,用于实施基于Web的程序管理系统。

获取原文
获取原文并翻译 | 示例

摘要

In this study the researcher applied an Information Systems Project Delivery Methodology (ISPDM) for implementing a Web-based Program Management System in an organization that did not have one. The problem investigated in this study was the difficulty encountered when organizations implement ISPDMs. The research questions were (1) what is the role of each of Roberts' et al. five factors in the implementation of an ISPDM? and (2) how effective is a Web-based program management system implemented using an ISPDM in meeting the participants desired outcomes? The general approach utilized to address the research questions was to describe the implementation of a Web-based program management ISPDM using a single descriptive case study. A survey, focus group, and usability testing were utilized at three different stages of the Web-based program management module's implementation.; In conducting this research, multiple sources of data were collected to develop an in-depth description of the case as it developed. The open-ended survey was given at three different points, the beginning, middle and end of the ISPDM Web-based program management module implementation. Results of this study indicated the role of organizational transition when implementing a Web-based program management system using an ISPDM is to provide training, education, and communications. The role of functional management involvement/support during the implementation process is to provide resources and lead the process of adopting the new methodology. The role of the ISPDM during the transition stage is to communicate the change and to foster cultural integration, provide a framework for using the product, and to provide training. The role of the use of software development models in the implementation process is to provide guidelines, framework, metrics, and to lend credibility to the value of the methodology. The role of external support during the implementation process is to provide an industry-wide knowledge base, oversight, and an independent review of the new methodology.
机译:在这项研究中,研究人员应用信息系统项目交付方法论(ISPDM)在没有组织的组织中实施基于Web的程序管理系统。本研究调查的问题是组织实施ISPDM时遇到的困难。研究的问题是(1)罗伯茨等人的角色是什么。实施ISPDM的五个因素? (2)使用ISPDM实现的基于Web的程序管理系统在满足参与者期望的结果方面效果如何?解决研究问题的通用方法是使用单个描述性案例研究来描述基于Web的程序管理ISPDM的实现。在基于Web的程序管理模块的三个不同实施阶段中,使用了调查,焦点小组和可用性测试。在进行这项研究时,收集了多种数据来源,以对案件的发展进行深入的描述。开放式调查是在三个不同点进行的,分别是ISPDM基于Web的程序管理模块实现的开始,中间和结束。这项研究的结果表明,在使用ISPDM实施基于Web的程序管理系统时,组织过渡的作用是提供培训,教育和沟通。职能管理部门在实施过程中的参与/支持的作用是提供资源并领导采用新方法的过程。 ISPDM在过渡阶段的作用是传达变更并促进文化整合,提供使用该产品的框架并提供培训。在实施过程中使用软件开发模型的作用是提供准则,框架,指标,并为方法论的价值提供信誉。在实施过程中,外部支持的作用是提供整个行业的知识库,监督和对新方法的独立审核。

著录项

  • 作者

    Booth, Ronald L.;

  • 作者单位

    Nova Southeastern University.;

  • 授予单位 Nova Southeastern University.;
  • 学科 Computer Science.
  • 学位 Ph.D.
  • 年度 2003
  • 页码 170 p.
  • 总页数 170
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 自动化技术、计算机技术;
  • 关键词

  • 入库时间 2022-08-17 11:45:49

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号