首页> 外文学位 >Short circuit analysis and circuit breaker interrupting capability validations for industrial power plants.
【24h】

Short circuit analysis and circuit breaker interrupting capability validations for industrial power plants.

机译:工业发电厂的短路分析和断路器中断能力验证。

获取原文
获取原文并翻译 | 示例

摘要

The purpose of this study is to determine the short circuit current as well as evaluate the interrupting capability of the circuit breaker with higher accuracy for industrial power plants. Power plant protection and coordination involves prevention of injury to personnel, minimizing damage to the system components, and limiting the extent and duration of service interruption whenever equipment failure, human error, or adverse natural events occur on any portion of the system. The cause for any of these circumstances is very unpredictable, but through sound system design we can reduce the levels of impact.;Power plant protection is one of the most essential features during the planning, design, and operation of power plant as it ensures the safety of the personnel, reliability of electrical supply and has a profound influence on the economics of system. It is therefore essential that system protection is examined in each stage to ensure a proper protection plan that is capable of being coordinated and is flexible enough to grow with the system.;The isolation of short circuits requires the application of protective equipment that will both sense the presence of abnormal current and remove the affected portion of the system. Fuses, Circuit Breakers and Relays are the main types of protective equipment that sense and remove the affected system during faults. One of the most important tasks of the system designer is to determine the interrupting capability of the protective equipment such that it is compatible with the available ratings of the circuit breaker and fuses.;This study validates circuit breaker interrupting capability for industrial power plants through the short circuit analysis. As the interrupting capability allows determining the exact rating of the protective equipment, the more precise the method to determine these values allows the system design to be safer and efficient. The existing techniques of short circuit analysis would be discussed in detail and the validation procedure will be explained with the help of IEEE13 bus Industrial Distribution system.
机译:这项研究的目的是确定短路电流,并以更高的精度评估工业发电厂的断路器的分断能力。发电厂的保护与协调涉及防止人员受伤,最大程度地减少对系统组件的损坏以及在系统任何部分发生设备故障,人为错误或不良自然事件时限制服务中断的程度和持续时间。任何一种情况的原因都是无法预料的,​​但是通过完善的系统设计,我们可以减少影响的水平。电厂的保护是电厂规划,设计和运行期间最重要的功能之一,因为它可以确保电厂的安全。人员安全,供电可靠性以及对系统经济性的深远影响。因此,至关重要的是,必须在每个阶段检查系统保护,以确保制定适当的保护计划,该计划应能够协调并具有足够的灵活性,以随系统发展。存在异常电流并移除系统的受影响部分。熔断器,断路器和继电器是在故障期间感测并移除受影响的系统的主要防护设备。系统设计人员最重要的任务之一是确定保护设备的中断能力,使其与断路器和熔断器的可用额定值兼容。短路分析。由于中断能力可以确定保护设备的准确额定值,因此确定这些值的方法越精确,系统设计就越安全有效。将详细讨论现有的短路分析技术,并借助IEEE13总线工业配电系统解释验证过程。

著录项

  • 作者单位

    The University of Texas at Arlington.;

  • 授予单位 The University of Texas at Arlington.;
  • 学科 Electrical engineering.
  • 学位 M.S.
  • 年度 2011
  • 页码 82 p.
  • 总页数 82
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:45:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号