Experimental study on prefabricated concrete bridge girder-to-girder connections.

机译:预制混凝土桥梁梁间连接的试验研究。

获取原文
获取原文并翻译 | 示例

摘要

The current practice of bridge construction and maintenance is to use prefabricated girders with cast-in-place concrete deck, which takes a relatively long time to open the bridge to the traffic. This thesis reports on an experimental investigation on the behavior and ultimate load carrying capacity of bridge deck slab connections between adjacent precast girders for new prefabricated bridge system. In this study, three types of moment transferring connections and two intermittent bolted connections were developed. The primary intention of these connections is to minimize traffic disruptions, improve work-zone safety, minimize environmental impact, improve constructability and quality, and lowers life-cycle costs of the bridges. A total of eight experimental tests were conducted for different connection details and simulated wheel load locations. A correlation between the theoretical ultimate load, as obtained using the Yield Line theory and the available punching shear capacity equations, and the experimental findings was achieved.
机译:桥梁建设和维护的当前做法是使用预制的大梁和现浇混凝土面板,这需要相对较长的时间才能将桥梁通向交通。本文对新型预制桥梁系统相邻预制梁之间的桥面板连接性能和极限承载力进行了实验研究。在这项研究中,开发了三种类型的力矩传递连接和两个间歇性螺栓连接。这些连接的主要目的是最大程度地减少交通中断,提高工作区安全性,最小化环境影响,提高可施工性和质量,并降低桥梁的生命周期成本。针对不同的连接细节和模拟的车轮负载位置,总共进行了八项实验测试。使用屈服线理论获得的理论极限载荷与可用的冲切剪切力方程之间存在相关性,并且获得了实验结果。

著录项

  • 作者

    Shah, Bijal.;

  • 作者单位

    Ryerson University (Canada).;

  • 授予单位 Ryerson University (Canada).;
  • 学科 Engineering Civil.
  • 学位 M.A.Sc.
  • 年度 2004
  • 页码 300 p.
  • 总页数 300
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号