首页> 外文学位 >Design of steel splice repair for decaying timber piles on Oklahoma county bridges.
【24h】

Design of steel splice repair for decaying timber piles on Oklahoma county bridges.

机译:俄克拉荷马州县桥上腐烂的木桩的钢接头修复设计。

获取原文
获取原文并翻译 | 示例

摘要

Scope and Method of Study: The purpose of this project was to identify recurring structural issues on off-system bridges and design an inexpensive, simple repair to resolve the problem. After communicating with multiple sources, it was disclosed that an existing repair had been installed in the past to solve issues regarding decaying timber piles on older timber bridges. This repair had not been tested in the field, nor did it have a standard design. The repair can be described as a steel splice because it involves removing a length of decayed timber pile (from the pile cap to the ground) from under a bridge, and replacing that section with a steel member, either an H-Pile or a pipe. The steel section is then connected to the existing timber pile below grade by way of a fabricated sleeve, made up of a section of pipe that slides over the timber pile and a steel plate that is welded on top of the pipe. Field testing of this repair was conducted to determine the performance of the repair.;Findings and Conclusions: Based on the field testing results, this repair is an effective way to provide a load path from a pile cap to a foundation. The installation is simple, inexpensive, and can be completed in less than eight hours. To standardize the design of the repair and ensure a conservative capacity, design tables were created to help choose the dimensions of steel that need to be used. These sizes correspond with pipes and H-Piles that county governments typically have inexpensive access to. Included with the design tables are all design details and installation procedures.
机译:研究范围和方法:该项目的目的是确定系统外桥梁上反复出现的结构问题,并设计一种廉价,简单的维修方法来解决问题。在与多个消息来源进行沟通之后,据披露,过去已经安装了现有的维修工具,以解决有关旧木桥上的木桩腐烂的问题。该维修尚未在现场进行测试,也没有标准设计。修复可以描述为钢接头,因为它涉及从桥下移除一段腐烂的木桩(从桩帽到地面),并用H形桩或管道的钢构件代替该部分。 。然后,将钢段通过预制套管连接到地下以下的现有木桩,该套管由一段在木桩上滑动的管段和一块焊接在管顶上的钢板组成。结果进行了现场测试以确定性能。结论和结论:根据现场测试结果,这种修复是提供从桩帽到基础的荷载路径的有效方法。安装简单,便宜,并且可以在不到八小时的时间内完成。为了使维修设计标准化并确保保守的能力,创建了设计表以帮助选择需要使用的钢材尺寸。这些尺寸对应于县政府通常廉价访问的管道和H-Piles。设计表中包括所有设计细节和安装过程。

著录项

  • 作者

    Pretorius, David Neil.;

  • 作者单位

    Oklahoma State University.;

  • 授予单位 Oklahoma State University.;
  • 学科 Engineering Civil.
  • 学位 M.S.
  • 年度 2012
  • 页码 136 p.
  • 总页数 136
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号