首页> 外文学位 >Project Controls for Engineering Work in Practice.
【24h】

Project Controls for Engineering Work in Practice.

机译:实践中的工程工作的项目控制。

获取原文
获取原文并翻译 | 示例

摘要

Engineering work can account for 10% to 20% of capital project costs, and up to 50% of a project’s schedule. The construction industry rigorously implements control techniques to minimize cost and schedule overruns; however, the same cannot be said for controlling engineering work. Over the years, engineering work has proven its susceptibility to cost and schedule overrun, yet controls have not been implemented to the same level of rigor. In practice, engineering work is controlled through techniques such as schedule and accounting summaries and neglects the relationship between cost, schedule and progress. This research aims to improve project control of engineering work in practice by adapting Earned Value Management (EVM) techniques used in construction to the requirements of engineering work. Techniques for EVM baseline development and maintenance, progress measurement, performance analysis, forecasting, and corrective action are customized to the engineering effort and successfully applied on two major engineering projects.
机译:工程工作可占基本建设成本的10%至20%,最多可占项目进度的50%。建筑行业严格执行控制技术,以最大程度地降低成本和进度超支;但是,控制工程工作并不能说同样的话。多年以来,工程工作已经证明了其对成本和进度超支的敏感性,但尚未将控制措施实施到同样严格的水平。在实践中,工程工作是通过进度计划和会计摘要等技术来控制的,而忽略了成本,进度和进度之间的关系。这项研究旨在通过使建筑中使用的挣值管理(EVM)技术适应工程工作的要求,从而改善实践中对工程工作的项目控制。 EVM基线开发和维护,进度测量,性能分析,预测和纠正措施的技术已根据工程工作量身定制,并成功应用于两个主要工程项目。

著录项

  • 作者

    Kostelyk, Jesse D.;

  • 作者单位

    University of Alberta (Canada).;

  • 授予单位 University of Alberta (Canada).;
  • 学科 Engineering Civil.
  • 学位 M.S.
  • 年度 2012
  • 页码 264 p.
  • 总页数 264
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 老年病学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号