Megaproject Review in the Megaprogram Context: Examining Alberta Bitumen Development.

机译:在Megaprogram上下文中进行Megaproject审查:检查Alberta沥青的开发。

获取原文
获取原文并翻译 | 示例

摘要

In recent decades northern Alberta has come to be one of the world's most important sources of new oil production. There are 175 billion barrels of bitumen under development, and government and developers are rapidly expanding their capacity to produce it, often through the construction of megaprojects. Both the federal and Alberta governments have review processes in place to scrutinize proposals for new projects. It is the aim of this thesis to examine how such processes should be conducted, to evaluate the federal and Alberta processes, and to identify means with which these processes might be improved.;Megaprojects, and the 'megaprograms' that megaprojects may exist within as they do in the case of bitumen development, pose numerous challenges to project review. Therefore a robust project review process is necessary to ensure that only sound development proceeds and the public interest is protected. Twenty-two sets of 'good practices' are identified.;The good practices are used as a measuring stick to evaluate the existing federal and Alberta review processes. The results of the evaluation are multi-facetted but can be summed up as concerning. Bitumen development is shaping Canadian society today, yet the federal and Alberta processes for reviewing proposals has serious shortcomings.;To help inform the good practices, particularly with respect to sound methodology in impact assessment, a cost-benefit analysis of the Kearl bitumen mine is undertaken. The case study concludes that the project could be an overall net social cost to society, in large part because of the high costs of the project and its greenhouse gas damages. It is concluded that cost-benefit analysis is highly useful to project review and should be used in either its traditional form, or in a modified way, though always in respect of its limitations.;Eighty three recommendations for the federal and Alberta governments are identified to help improve the process for the review of bitumen megaproject proposals. Many recommendations revolve around the need for the governments to fill in gaps with respect to cumulative effects management and planning of the bitumen megaprogram.;Keywords: megaproject; environmental assessment; impact assessment; cost-benefit analysis; oil sands; tar sands.
机译:近几十年来,艾伯塔省北部已成为世界上最重要的新石油生产来源之一。目前正在开发的沥青为1,750亿桶,政府和开发商通常通过建设大型项目来迅速扩大其生产能力。联邦政府和艾伯塔省政府都制定了审查程序,以审查新项目的提案。本文的目的是研究应如何进行此类流程,评估联邦和艾伯塔省的流程,并确定可以改进这些流程的方式。大型项目以及大型项目可能存在于其中的“大型程序”它们在沥青开发的情况下确实会给项目审查带来许多挑战。因此,必须有一个健壮的项目审查流程来确保仅进行良好的开发并保护公共利益。确定了22套“良好实践”。良好实践被用作评估现有联邦和艾伯塔省审查程序的量尺。评估结果是多方面的,但可以归纳为有关方面。如今,沥青的发展正在影响着加拿大社会,但联邦和艾伯塔省的提案审查程序却存在严重缺陷。为了帮助了解良好做法,尤其是在影响评估中采用合理的方法方面,对科尔石沥青矿进行了成本效益分析承担。案例研究得出的结论是,该项目可能是整个社会的净社会成本,这在很大程度上是由于该项目的高成本及其温室气体损害。结论是成本效益分析对项目审查非常有用,尽管总会受到局限性的影响,但应以传统形式或修改形式使用;确定了针对联邦和艾伯塔省政府的八十三项建议有助于改善沥青超大型项目提案的审核过程。许多建议围绕政府需要填补在沥青巨型项目的累积效应管理和规划方面的空白。环境评估;影响评估;成本效益分析;油砂;焦油砂。

著录项

  • 作者单位

    Simon Fraser University (Canada).;

  • 授予单位 Simon Fraser University (Canada).;
  • 学科 Natural resource management.;Petroleum geology.
  • 学位 Ph.D.
  • 年度 2013
  • 页码 529 p.
  • 总页数 529
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号