首页> 外文学位 >A conceptual model of success for design and build projects in the public sector of Hong Kong.
【24h】

A conceptual model of success for design and build projects in the public sector of Hong Kong.

机译:香港公共部门设计和建造项目成功的概念模型。

获取原文
获取原文并翻译 | 示例

摘要

The traditional design-bid-build procurement method is considered by many construction clients to be significantly flawed with problems, such as delays in construction work and poor quality standards. To cater for the increasing complexity of projects and the growing emphasis on client's requirements, alternative procurement systems have evolved and Design-Build (D&B) has been increasing in popularity worldwide for better project performance.; This research provides an evaluation of the current practice of the D&B method in the Hong Kong context with a view to developing a conceptual model of success of D&B projects. The main reasons for a wider adoption of the D&B method in the public sector were found to be related to the expertise and responsibilities of the contractor. While major problems concern time pressure, stress by the client and frequent changes by end-users, the choice of the D&B method in Hong Kong is negatively impacted by the additional efforts demanded by the contractor and the client. In addition, a project success equation has been formulated from the principal components analysis so that the success level of a D&B project can be expressed by an index composed of the scores in the performance of time, cost, quality and functionality of the D&B project. Factor Analysis has re-grouped the success variables into twelve factor categories, which are independent variables generating multiple linear equations with the five dependent variables. The strongest predictor of D&B project success is the effectiveness of project management action. Other predictors of success include the client's input in the project, working relationships among project team members, project attractiveness and application of innovative management approaches. A further test of five samples provided evidence that the regression models are good predictors of D&B project success and D&B project participants have shown agreement on the results. (Abstract shortened by UMI.)
机译:许多建筑业客户认为,传统的“设计—投标—建造”采购方法存在严重缺陷,例如施工工作延误和质量标准不佳。为了满足项目日益增加的复杂性和对客户需求的日益重视,替代性采购系统已经发展,设计建造(D&B)在世界范围内越来越受欢迎,以提高项目绩效。这项研究评估了香港背景下D&B方法的当前实践,以期开发D&B项目成功的概念模型。人们发现在公共部门广泛采用D&B方法的主要原因与承包商的专业知识和责任有关。虽然主要的问题涉及时间压力,客户的压力以及最终用户的频繁更改,但在香港选择D&B方法受到承包商和客户的额外努力的负面影响。此外,已经从主成分分析中得出了项目成功方程,因此D&B项目的成功水平可以由D&B项目在时间,成本,质量和功能方面的得分组成的指数来表示。因子分析将成功变量重新分组为十二个因子类别,它们是独立变量,生成具有五个因变量的多个线性方程。 D&B项目成功的最强预测指标是项目管理行动的有效性。其他成功的预测因素包括客户在项目中的投入,项目团队成员之间的工作关系,项目吸引力以及创新管理方法的应用。对五个样本的进一步测试提供了证据,表明回归模型可以很好地预测D&B项目的成功,并且D&B项目的参与者对结果表示同意。 (摘要由UMI缩短。)

著录项

  • 作者

    Lam, Wai Ming.;

  • 作者单位

    Hong Kong Polytechnic University (People's Republic of China).;

  • 授予单位 Hong Kong Polytechnic University (People's Republic of China).;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 2005
  • 页码 406 p.
  • 总页数 406
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-17 11:41:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号