首页> 外文学位 >Modeling and parameter ranking of construction labor productivity.
【24h】

Modeling and parameter ranking of construction labor productivity.

机译:建筑工人生产率的建模和参数排名。

获取原文
获取原文并翻译 | 示例

摘要

For having, both a qualitative as well as a quantitative analysis of various aspects of the topic, a field investigation spanning over eighteen months, for collecting actual data from on-going construction sites was carried out. The set of nine input parameters which is selected for this study is considered to be the one which causes short term or daily variations in productivity.; The entire analysis and experimentation can be divided into three main parts, those of modeling the phenomenon, ranking the independent variables in the order of their relative significance and determining and graphically depicting the exclusive influences of each variable on the output which is daily productivity of formwork installation operations.; Various neural network models under different paradigms and network settings were developed and compared for performances under the criteria of R 2, MSE and MAE. The best performing model of Back Propagation with modified learning rate and momentum was validated with data unexposed to the model. (Abstract shortened by UMI.)
机译:为了对该主题各个方面进行定性和定量分析,我们进行了长达18个月的现场调查,以从正在进行的施工现场收集实际数据。为这项研究选择的九个输入参数的集合被认为是导致生产率短期或每日变化的参数。整个分析和实验可以分为三个主要部分,即对现象进行建模,按照变量的相对重要性对独立变量进行排序,确定并以图形方式描绘每个变量对产出的排他性影响,这些影响是模板的日常生产率。安装操作。开发了不同范式和网络设置下的各种神经网络模型,并比较了R 2,MSE和MAE准则下的性能。反向传播的最佳性能模型具有修改后的学习速度和动量,并通过未暴露给模型的数据进行验证。 (摘要由UMI缩短。)

著录项

  • 作者

    Khan, Zafar Ullah.;

  • 作者单位

    Concordia University (Canada).;

  • 授予单位 Concordia University (Canada).;
  • 学科 Engineering Civil.; Operations Research.
  • 学位 M.A.Sc.
  • 年度 2005
  • 页码 190 p.
  • 总页数 190
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;运筹学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号