Strategic planning of an underground mine is a complex activity that requires several steps. This level of planning defines the strategy of the company for the next years. The planning horizon is relatively long but it depends on the resources and reserves of the mine. During the scheduling of an underground mine, several aspects must be evaluated such as the start and the end of the mine, the production rate, the cut-off grade, etc.. When several mines can begin at the same time and are using the same human and material resources, the difficulty of the problem increases. Under these conditions, it is hard to get a good solution quickly with manual methods. The cut-off grade is also a strategic decision and is closely related to planning. It is therefore necessary to incorporate this decision into the strategic plan. Once again, the complexity increases as the duration of the work is related to the content of selected cut-off grade.;Strategic planning for open pit mining is well documented but the application of the operational research in underground is newer. In this paper, a mixed integer program (MIP) is proposed to solve a problem of strategic planning of an underground mine. The model is specifically developed for Raglan Mine in northern Quebec. The model will serve as a tool for decision support for the Raglan Mine's engineers. Raglan Mine has four mines in operation and several potential mining projects. It becomes difficult to determine when a project must start. Using the model, several scenarios can be tested. It should be noted that the model is general and can be easily modified to fit with other mines.;This master thesis can be divided into two main themes: the parameters evaluation and mathematical model. The parameters evaluation is important because many steps must be performed before the planning. Normally, the design must be done before the planning. In this paper, the design for a new mine is evaluated by statistical curves. This method can get a solution to the design criteria established in the past. If a real design is made, the activities can be added to the model to get a better estimate of the mine profit. Once the parameters evaluated, the model is used to define the optimal schedule and the best cut-off grade. The current theory of the cut-off grade is difficult to apply in the context of Raglan Mine. In fact, each deposite at Raglan Mine has is own grade-tonnage curve. The choice of cut-off is made by the model that allows each deposite to have its own cut-off grade.
机译:地下矿山的战略规划是一项复杂的活动,需要几个步骤。此级别的计划定义了公司未来几年的战略。规划期相对较长,但取决于矿山的资源和储量。在安排地下矿井的过程中,必须评估多个方面,例如矿井的开始和结束,生产率,边界品位等。当多个矿井可以同时开始并且正在使用同样的人力和物力,问题的难度就会增加。在这种情况下,很难通过手动方法快速找到好的解决方案。截止级别也是一项战略决策,与计划密切相关。因此,有必要将该决定纳入战略计划。随着工作时间的长短与所选择的临界品位的内容有关,复杂性再次增加。露天采矿的战略规划已有详细记录,但运筹学在地下的应用较新。为了解决地下矿山的战略规划问题,提出了一种混合整数程序(MIP)。该模型是专门为魁北克北部的拉格伦矿开发的。该模型将用作Raglan矿井工程师的决策支持工具。拉格兰煤矿有四个正在运营的矿山和几个潜在的采矿项目。很难确定何时必须启动项目。使用该模型,可以测试几种情况。应该注意的是,该模型是通用的,可以很容易地修改以适合其他矿山。本论文可以分为两个主要主题:参数评估和数学模型。参数评估很重要,因为在计划之前必须执行许多步骤。通常,必须在计划之前完成设计。在本文中,通过统计曲线评估了新矿山的设计。这种方法可以解决过去建立的设计标准。如果进行了实际设计,则可以将活动添加到模型中,以更好地估算矿山利润。一旦评估了参数,就可以使用该模型定义最佳进度表和最佳截止等级。当前的临界品位理论很难在拉格兰煤矿中应用。实际上,拉格兰矿场的每个矿床都有自己的品位-吨位曲线。临界值的选择由允许每个存款人拥有自己的临界值等级的模型决定。

著录项

  • 作者

    Collard, Jean.;

  • 作者单位

    Ecole Polytechnique, Montreal (Canada).;

  • 授予单位 Ecole Polytechnique, Montreal (Canada).;
  • 学科 Operations research.;Mining engineering.
  • 学位 M.Sc.A.
  • 年度 2013
  • 页码 64 p.
  • 总页数 64
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号