首页> 外文学位 >An economic analysis of sediment control use at construction sites in Greenville County, South Carolina.
【24h】

An economic analysis of sediment control use at construction sites in Greenville County, South Carolina.

机译:对南卡罗来纳州格林维尔县建筑工地使用沉积物进行控制的经济分析。

获取原文
获取原文并翻译 | 示例

摘要

Soil erosion from construction sites can cause sedimentation of nearby water bodies. Mandatory sediment controls can reduce sedimentation. What determines the degree to which sediment controls meet regulatory standards for installation and maintenance? A conditional-multinomial logit model is estimated with data from 85 construction sites that were audited in 2001 or 2005 in Greenville County, SC to determine whether 147 sediment ponds or traps were installed correctly, properly maintained, or both. Costs of maintenance positively affect the probability that a sediment pond or trap is properly maintained. Engineering experience positively affects the probability that a structure is properly maintained. Construction site distance from the county's regulatory office positively affects the probability that a sediment control is installed incorrectly.
机译:施工现场的水土流失会导致附近水体的沉积。强制性的泥沙控制可以减少沉淀。决定沉积物控制达到安装和维护法规标准的程度是由什么决定的?使用来自2001年或2005年在南卡罗来纳州格林维尔县进行审核的85个建筑工地的数据,估计了条件多项式logit模型,以确定是否正确安装了147个沉淀池或陷阱,或对其进行了适当的维护,或者对两者进行了适当的维护。维护成本对正确维护沉积物池或陷阱的可能性产生积极影响。工程经验会积极影响正确维护结构的可能性。施工现场与县监管局之间的距离会积极影响沉积物控制装置安装不正确的可能性。

著录项

  • 作者

    Lowdermilk, Jamey Mavis.;

  • 作者单位

    Clemson University.;

  • 授予单位 Clemson University.;
  • 学科 Environmental economics.;Civil engineering.
  • 学位 M.S.
  • 年度 2010
  • 页码 69 p.
  • 总页数 69
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号