Scope and method of study. Contract time, is the maximum time allowed for completion of all work described in contract documents. The determination of contract time affects not only the actual duration of the construction project, but also such aspects of construction such as costs, resource planning, selection of contractors and traffic problems. An accurate estimation of contract time reduces the impact of a delayed project on the local economy and provides justification to contractors during construction claims. This research performed an extensive literature review on various contract time determination procedures and systems developed and used by various state agencies to estimate contract time for their highway projects. This study surveyed 24 DOTs in the United States to determine the prevalent contract time procedures and determined their advantages and disadvantages.; Findings and conclusions. Oklahoma Contract Time Determination System (Ok-CTDS) is a contract time estimating system for Tier-II type highway projects of ODOT which are categorized into eight types of road projects. The manual CTD system consists of nine templates, one general template for Tier I type category and eight templates for Tier II type category. The CTDS user supplies the system with actual work quantities for established controlling activities for a project and by applying average or project specific production rates, durations for each controlling activity can be calculated. A standalone computer software was developed using VB.Net linked with Microsoft Access database and Microsoft Project for estimating contract time in working days. This software is recommended to be used in ODOT for effectively running the contract time determination system. The major benefit of this system to ODOT is that its continuous use would provide a structured approach towards contract time estimation. This system will expedite the contract time estimation process, provide documentation for a stronger defense in contract time disputes and allow less experienced schedulers to gain confidence as they learn how to estimate reasonable and realistic contract times.
机译:研究范围和方法。合同时间是合同文件中描述的完成所有工作所允许的最长时间。合同时间的确定不仅影响建设项目的实际工期,而且还影响诸如成本,资源计划,承包商选择和交通问题之类的建设方面。准确的合同时间估算可以减少延迟的项目对当地经济的影响,并在施工索赔期间为承包商提供依据。这项研究对各种州政府机构开发和使用的各种合同时间确定程序和系统进行了广泛的文献综述,以估算其公路项目的合同时间。这项研究调查了美国的24个DOT,以确定普遍的合同时间程序并确定其优缺点。结论和结论。俄克拉荷马州合同时间确定系统(Ok-CTDS)是ODOT的II类公路项目的合同时间估算系统,该系统分为八类公路项目。手动CTD系统包括九个模板,一个用于Tier I类型类别的通用模板,以及八个用于Tier II类型类别的模板。 CTDS用户为系统提供了用于项目控制活动的实际工作量,并且通过应用平均或项目特定的生产率,可以计算每个控制活动的持续时间。使用与Microsoft Access数据库和Microsoft Project链接的VB.Net开发了独立的计算机软件,以估计工作日的合同时间。建议在ODOT中使用此软件,以有效运行合同时间确定系统。该系统对ODOT的主要好处是,其连续使用将为合同时间估计提供结构化的方法。该系统将加快合同时间估算过程,提供文档以在合同时间纠纷中提供更强有力的辩护,并让经验不足的调度员在学习如何估算合理和现实的合同时间时获得信心。

著录项

  • 作者

    Atreya, Siddharth K.;

  • 作者单位

    Oklahoma State University.$bCivil & Environmental Engineering.;

  • 授予单位 Oklahoma State University.$bCivil & Environmental Engineering.;
  • 学科 Engineering Civil.
  • 学位 M.S.
  • 年度 2007
  • 页码 183 p.
  • 总页数 183
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号