首页> 外文学位 >A System Dynamics Approach to Understanding the Long-Term Effects of Requirement Changes and Unit Quantity Changes during DoD Acquisition.
【24h】

A System Dynamics Approach to Understanding the Long-Term Effects of Requirement Changes and Unit Quantity Changes during DoD Acquisition.

机译:一种系统动力学方法,用于了解国防部采购期间需求变化和单位数量变化的长期影响。

获取原文
获取原文并翻译 | 示例

摘要

Cost overruns within the Department of Defense (DoD) acquisitions are widespread and have come to be accepted by program managers as a daunting challenge. A study of 35 major defense acquisition programs has identified requirement changes and unit quantity changes as the two main decision factors contributing to cost growth. Similarly, some of the factors cited in Selected Acquisition Reports as being responsible for significant cost overruns are requirement changes and unit quantity changes. This dissertation focuses on these two factors and investigates the dynamic relationship they have with program acquisition cost. Currently, there are no proven methods to assist program managers with dynamically evaluating the long-term effects of requirement changes and unit quantity changes. Understanding the long-term effects of these changes will help support decision making, strategic resource planning, and investment forecasting. In addition to helping program managers understand the effect of these changes, there is a need to identify their unintended consequences.;We present a methodology for understanding the dynamic relationship between the variables of requirement changes, unit quantity changes, and cost of major programs. A system dynamics approach is taken to understand the long-term effects of requirement changes and unit quantity changes on acquisition cost. The proposed methodology introduces the Balance Model based on system dynamics principles to clarify the interplay between variables and provide detailed insight into their effect on program cost. This insight provides program managers with proactive decision opportunities for avoiding cost overrun during DoD acquisition life cycles.
机译:国防部(DoD)采购中的成本超支现象普遍存在,并已被计划经理接受为艰巨的挑战。对35个主要国防采购计划的研究已将需求变化和单位数量变化确定为导致成本增长的两个主要决策因素。同样,“选定的采购报告”中引用的导致重大成本超支的一些因素是需求变更和单位数量变更。本文针对这两个因素,研究了它们与程序购置成本之间的动态关系。当前,尚无行之有效的方法来协助计划经理动态评估需求变化和单位数量变化的长期影响。了解这些变化的长期影响将有助于支持决策,战略资源规划和投资预测。除了帮助计划经理了解这些变更的影响之外,还需要确定其意外后果。我们提供了一种方法,用于理解需求变更,单位数量变更和主要计划成本之间的动态关系。采用系统动力学方法来了解需求变化和单位数量变化对购置成本的长期影响。所提出的方法引入了基于系统动力学原理的平衡模型,以阐明变量之间的相互影响,并详细了解变量对程序成本的影响。这种见解为计划经理提供了主动决策机会,从而避免在国防部采购生命周期中造成成本超支。

著录项

  • 作者

    Shin, Daniel S.;

  • 作者单位

    The George Washington University.;

  • 授予单位 The George Washington University.;
  • 学科 Engineering.
  • 学位 Ph.D.
  • 年度 2016
  • 页码 256 p.
  • 总页数 256
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号