首页> 外文学位 >Methodology for the operational performance assessment of two-lane highway facilities.
【24h】

Methodology for the operational performance assessment of two-lane highway facilities.

机译:两车道公路设施运营绩效评估的方法。

获取原文
获取原文并翻译 | 示例

摘要

Traffic engineers have indicated that a facility-based evaluation methodology for two-lane highways would be much more useful and practical to them than just the individual segment and point analysis methodologies. A facility level analysis will allow the various features (e.g., isolated intersections, continuous grades, passing lanes) that are typical to an extended length of two-lane highway to be addressed in a combined analysis with a single performance measure and level of service value resulting.; Currently there is not any operational analysis methodology to address two-lane highways with different segment types at the facility level. The scope of analysis provided in the Highway Capacity Manual (HCM) 2000 for two-lane highway is limited to separated segment within the facility.; In this dissertation, a methodology is developed to assess the operational performance of an extended length of a two-lane highway facility, which might include an occasional signalized intersection and other control or roadway segments.; The methodology maintains some fidelity to the HCM 2000 by using the existing methodologies for the two-lane highway segments and signalized intersections. Meanwhile, the individual segment in the whole facility is not regarded as an isolated object, and the impacts between segments are taken into account. A common time/delay based measure (percent time-delayed) is used for each segment and point of the entire facility.; The primary contribution of this dissertation is the development of analytical relationships to determine the upstream and downstream boundary points that define the transition between basis two-lane highway segments and the effective influence area of the signalized intersection and the TWSC intersection, as well as the corresponding method for calculation of an overall facility service measure based upon percent time-delayed and then translating it to a Level Of Service (LOS) grade.; The dissertation focuses the efforts on developing the methodology for operational analysis of a two-lane highway with an isolated signalized intersection at the facility level. Nonetheless, this research also provides a model for the basic structure of a facility level analysis that will be amenable to the incorporation of a variety of segment types. Finally the methodology has been incorporated into the existing HIGHPLAN software program.
机译:交通工程师指出,基于设施的两车道公路评估方法比单独的路段和点分析方法更为实用。设施水平分析将允许通过单个性能度量和服务价值水平的组合分析来解决两车道高速公路扩展长度所特有的各种特征(例如,隔离的交叉路口,连续的坡度,通过车道)结果。当前,尚无任何运营分析方法来解决设施级别上具有不同路段类型的两车道高速公路。 2000年《公路通行能力手册》(HCM)中针对两车道公路的分析范围仅限于设施内的单独路段。本文开发了一种方法来评估两车道高速公路设施的扩展长度的运行性能,该设施可能包括偶尔的信号交叉口和其他控制或道路段。该方法通过使用现有的用于两车道公路段和信号交叉口的方法,对HCM 2000保持了一定的保真度。同时,整个设施中的各个部分都不是孤立的对象,并且考虑了部分之间的影响。通用的基于时间/延迟的度量(延迟时间百分比)用于整个设施的每个路段和每个点。本文的主要贡献是建立了分析关系,以确定上游和下游边界点,这些边界点定义了基础两车道公路段之间的过渡以及信号交叉口和TWSC交叉口的有效影响区域,以及相应的一种基于时间延迟百分比的整体设施服务度量的计算方法,然后将其转换为服务水平(LOS)等级。本文致力于在设施水平上开发具有隔离信号交叉口的两车道高速公路的运营分析方法。尽管如此,这项研究还为设施水平分析的基本结构提供了一个模型,该模型将适用于各种细分类型的合并。最后,该方法已被纳入现有的HIGHPLAN软件程序中。

著录项

  • 作者

    Yu, Qingyong.;

  • 作者单位

    University of Florida.;

  • 授予单位 University of Florida.;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 2006
  • 页码 237 p.
  • 总页数 237
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号