Proposition d'un modele integre temps/cout/qualite sous incertitude en planification de projet.

机译:在项目计划不确定的情况下提出整合时间/成本/质量模型的建议。

获取原文
获取原文并翻译 | 示例

摘要

With the development of the technology and economics, the project management gradually becomes the focus of the management theory and practice. To stay competitive, companies are increasingly implementing initiatives to improve their project delivery by continually reducing cycle times, minimizing costs, and controlling quality. These dimensions (quality, time, and cost) are also referred to as the Project Management Triangle where each side represents a constraint. One side of the triangle cannot be changed without impacting the others. The time constraint refers to the amount of time available to complete a project. The cost constraint refers to the budgeted amount available for the project. The scope constraint refers to what must be done to produce the project's end result. These three constraints are often competing constraints: increased scope typically means increased time and increased cost, a tight time constraint could mean increased costs and reduced scope, and a tight budget could mean increased time and reduced scope. The discipline of project management is about providing the tools and techniques that enable the project team (not just the project manager) to organize their work to meet these constraints. Project Management tries to gain control over these three variables taking account the uncertainty inherent to every project situation. It requires skilled people, standardized processes, and technology---unified and driven by effective project management. This thesis tackle this difficult problem and proposes a general framework, based on the WBS that can be implemented to combine earned value management, earned quality management and risk management in order to 'maximise' the likelihood of achieving project objectives (time/cost/quality).; Key words. Time, cost, quality, risk, project management.
机译:随着技术和经济的发展,项目管理逐渐成为管理理论和实践的重点。为了保持竞争力,公司越来越多地实施计划,以通过不断减少周期时间,最小化成本和控制质量来改善项目交付。这些维度(质量,时间和成本)也称为“项目管理三角”,其中每一面代表一个约束。三角形的一侧不能改变而不会影响另一侧。时间限制是指可用于完成一个项目的时间量。成本约束是指可用于项目的预算金额。范围约束是指必须执行的操作才能产生项目的最终结果。这三个约束通常是相互竞争的约束:范围的扩大通常意味着时间增加和成本增加,时间紧的约束可能意味着成本增加和范围缩小,而预算紧缩则意味着时间增加和范围缩小。项目管理的纪律是提供工具和技术,使项目团队(而不仅仅是项目经理)能够组织工作来满足这些约束。考虑到每个项目情况固有的不确定性,项目管理试图控制这三个变量。它需要熟练的人员,标准化的流程和技术,而这些都是由有效的项目管理来统一和驱动的。本论文解决了这个难题,并提出了一个基于WBS的通用框架,可以将其组合起来,将挣值管理,挣质量管理和风险管理相结合,以“最大化”实现项目目标(时间/成本/质量)的可能性。 )。关键字时间,成本,质量,风险,项目管理。

著录项

  • 作者

    Guan, Binbin.;

  • 作者单位

    Universite du Quebec a Rimouski (Canada).;

  • 授予单位 Universite du Quebec a Rimouski (Canada).;
  • 学科 Business Administration Management.
  • 学位 M.Sc.
  • 年度 2007
  • 页码 81 p.
  • 总页数 81
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 贸易经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号