首页> 外文会议>World Mining Congress vol.1; 20031101-05; New Delhi(IN) >Restructuring of Coal Industry in the Republic of Slovenia
【24h】

Restructuring of Coal Industry in the Republic of Slovenia

机译:斯洛文尼亚共和国的煤炭工业重组

获取原文
获取原文并翻译 | 示例

摘要

Pursuant to the Energy Act, the electricity market in the Republic of Slovenia was deregulated on 1 January 2003. This completed the transition from the regulated to the market-based operation of companies including the producers as well as distributors and other entities in the power sector. The latter include the remaining operating coalmines. In order to determine the competitiveness of power generation companies and coalmines operating under deregulated electricity market conditions, various scenarios for the period 2001 - 2010 were developed. The objective was to define the impact of the introduction of individual mechanisms and sources of financing on the operation of the electricity market, on the competitiveness of power generation companies and, indirectly, on their business performance. In accordance with the results of the evaluation of these scenarios it was possible to identify certain measures to be implemented within the companies as well as measures to be implemented by the government in order to ensure continued stability of operation of companies in the power sector and coal mining companies following the deregulation of the electricity market. This paper presents the process of restructuring of the only coalmine of any significance in Slovenia, which is expected to continue to operate for another 25 years. The Premogovnik Velenje coal mining company has been gearing up for the accession of Slovenia to the European Union a number of years. In the process of defining their basic strategic business goals they have set themselves a very demanding task: no workers are to lose their jobs on account of the restructuring. The vision statement of the company clearly provides that lignite production will continue at the level ensuring efficient company operation in terms of technology as well as economy, the highest possible degree of occupational safety, humane working conditions and provision of efficient and effective solutions in relation to environmental issues arising from lignite mining.
机译:根据《能源法》,斯洛文尼亚共和国的电力市场于2003年1月1日解除管制。这完成了包括电力生产商,分销商和其他实体在内的公司从受管制的经营向市场化的过渡。 。后者包括剩余的运行中的煤矿。为了确定在放松电力市场条件下运营的发电公司和煤矿的竞争力,制定了2001年至2010年的各种方案。目的是确定采用单独的机制和融资来源对电力市场运行,对发电公司的竞争力以及对它们的业务绩效的间接影响。根据对这些方案的评估结果,可以确定公司内部要实施的某些措施以及政府要实施的措施,以确保电力和煤炭行业公司的持续经营稳定电力市场放松管制之后的矿业公司。本文介绍了斯洛文尼亚唯一具有重要意义的煤矿的重组过程,该煤矿预计将继续运行25年。多年来,Premogovnik Velenje煤矿公司一直在为斯洛文尼亚加入欧洲联盟做准备。在定义基本战略业务目标的过程中,他们给自己设定了非常艰巨的任务:没有任何工人因重组而失去工作。公司的愿景声明明确规定,褐煤的生产将继续在确保公司在技术和经济,有效的最高职业安全程度,人性化的工作条件以及提供与之相关的有效解决方案方面进行有效运营的水平。褐煤开采引起的环境问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号