【24h】

LONG-TERM BEHAVIOR OF KUROBE DAM AND ITS FOUNDATION ROCK

机译:KUROBE大坝及其基础岩石的长期行为

获取原文
获取原文并翻译 | 示例

摘要

Kurobe Dam, operated by Kansai Electric Power Co., Inc. (KEPCO), has been monitored for about 40 years since the first reservoir filling in 1960, mainly through the measurements taken for the dam body itself, as well as for the foundation rock. The long-term measurements revealed the following two points: First, highly accurate measurements on the valley width near the dam and detailed analyses on the data clearly revealed seasonal fluctuation in the width. By taking into consideration this "mountain deformation" phenomenon, rational explanation was made possible for actual deflection measurements at the dam crown, which could not be properly evaluated based only on hydrostatic pressure of the reservoir and thermal load. Second, detailed analyses on long-term measurements by rock deformeters revealed the continuous deformation in some part of the rock after the first full water, though it is infinitesimal in scale. These two phenomena were clarified only through the long-term measurements conducted at the dam, and the authors believe such data are rare and unique, not seen in the studies by overseas researchers.
机译:自1960年首次充填水库以来,由关西电力有限公司(KEPCO)运营的黑部大坝已进行了约40年的监测,主要是通过对坝体本身以及基础岩石的测量来进行的。长期测量显示出以下两点:首先,对大坝附近山谷宽度的高精度测量以及对数据的详细分析清楚地表明了宽度的季节性波动。通过考虑这种“山体变形”现象,可以对坝顶的实际挠度进行合理的解释,而仅根据储层的静水压力和热负荷就无法正确评估挠度。其次,对岩石变形仪进行的长期测量的详细分析显示,在第一次充水之后,岩石的某些部分会发生连续变形,尽管它的规模很小。仅通过在大坝上进行的长期测量才能澄清这两种现象,并且作者认为这些数据是稀有且独特的,海外研究人员的研究并未发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号