首页> 外文会议>Transit Development in Rock Mechanics: Recognition, Thinking and Innovation >Analysis of aquifuge beam mechanical model in the strip filling water preserved mining
【24h】

Analysis of aquifuge beam mechanical model in the strip filling water preserved mining

机译:条状充水保水开采中的含水梁力学模型分析

获取原文
获取原文并翻译 | 示例

摘要

According to the typical conditions of special water preserved mining area, the aquiclude stability with two equispaced tilling strips is analyzed by using the physical simulation experiment and theoretical analysis, and the mechanical model of elastic foundation beam of strip tilling aquiclude strata is set up.Based on that, the calculation method of load and the compression displacement of the tilling strip is presented, and the deflection formula of the water resisting beam is given, and the position and depth of the downward crack is determined.Based on the aquiclude stability criterion, the calculation method of reasonable tilling strip width and interval width is put forward.The result shows that the reasonable strip interval increases with the increase of the mining height, the thickness and strength of the beam, and the depth of the downward crack is mainly relate.
机译:根据特殊保水矿区的典型条件,通过物理模拟实验和理论分析,分析了两个等距耕作条带的含水层稳定性,建立了耕作层状带状弹性基础梁的力学模型。在此基础上,提出了耕作带的荷载和压缩位移的计算方法,给出了抗水梁的挠度公式,确定了向下裂缝的位置和深度。结果表明,合理的条带间距随开采高度,横梁的厚度和强度的增加而增加,而向下裂缝的深度主要与。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号