首页> 外文会议>Technical progress on sustainable hydropower development and roller compacted concrete dams >Risk Analysis of Dams during Construction Based on Catastrophe Evaluation Method
【24h】

Risk Analysis of Dams during Construction Based on Catastrophe Evaluation Method

机译:基于突变评价法的大坝施工风险分析

获取原文
获取原文并翻译 | 示例

摘要

To address the accident-prone problem of dams during construction,the difficulty of supervise and control construction goals such as safety,quality,process,costs,etc.,and the adverse effect that traditional risk assessment would cause when determine the weight of risk factors subjectively,this article,based on the establishment of comprehensive evaluation index system of dams during construction,the calculation of each goal and the comprehensive goal of value at risk using the catastrophe evaluation method,is to achieve the objective of comprehensive evaluation.Through applying the method to risk evaluation of the construction program of Yanshan Reservoir,the author verifies rationality of the method,which preferably offers instructions to engineering construction.
机译:为了解决大坝施工中容易发生事故的问题,监督和控制施工目标的安全性,质量,过程,成本等方面的困难,以及传统风险评估在确定风险因素的权重时所产生的不利影响从主观上讲,本文在建立大坝综合评价指标体系的基础上,运用巨灾评价法计算各项目标和风险价值综合目标,旨在达到综合评价的目的。对燕山水库建设方案进行风险评估的方法,验证了该方法的合理性,为工程建设提供指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号