Lessons Learnt from Operations of Some RCC Dams

机译:从一些碾压混凝土坝的运行中吸取的教训

获取原文
获取原文并翻译 | 示例

摘要

This article presents the return of RCC experience works designed,constructed and operated by EDF in France and abroad (Riou dam,Petit Saut dam in French Guyana,Nakai dam in Laos,Rizzanèse dam) as a critical analysis of the various problems encountered both during first impounding and after 3 to 24 years of operation.Lessons learned from these examples are presented.It is proposed that all professionals working in the field of RCC dam,inclueling Owners,Engineers,Consultants,Contractors and Operators,communicate more on this subject of RCC dams performances in order to benefit from these problems with useful information to all.
机译:本文介绍了法国电力公司在法国和国外(里约大坝,法属圭亚那的珀蒂索特大坝,老挝的纳凯大坝,里扎内塞大坝)设计,建造和运营的RCC经验工程的回归,作为对在此期间遇到的各种问题的批判性分析。首次蓄水和运行3至24年后。从这些示例中吸取的经验教训。建议在RCC大坝领域工作的所有专业人员,业主,工程师,顾问,承包商和运营商,都应就此主题进行更多的交流。 RCC阻止表演,以便从这些问题中受益并向所有人提供有用的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号