首页> 外文会议>Systems engineering: managing complexity and change >The Schedule as Independent Variable (SAIV) Process for Acquisition of Software-Intensive Systems
【24h】

The Schedule as Independent Variable (SAIV) Process for Acquisition of Software-Intensive Systems

机译:计划作为自变量(SAIV)流程,用于获取软件密集型系统

获取原文
获取原文并翻译 | 示例

摘要

Many system acquisitions do not achieve on-time delivery because of delays in softwarerndevelopment. This paper presents a highly successful approach for on-time delivery ofrnsoftware-intensive systems: the Schedule As Independent Variable (SAIV) process. The SAIVrnprocess involves prioritization of desired features; scoping a Core Capability of top-priorityrnfeatures easily achievable within the available schedule; architecting for ease of dropping orrnadding borderline-priority features; monitoring progress with respect to plans; and adding orrndropping borderline-priority features to meet the schedule target. The paper summarizesrnexperiences and discusses critical success factors in applying the SAIV acquisition processrnacross a range from small in-house e-services projects to very large Government systems ofrnsystems.
机译:由于软件开发的延迟,许多系统采购无法实现及时交付。本文为按时交付软件密集型系统提供了一种非常成功的方法:计划作为独立变量(SAIV)流程。 SAIVrn流程需要对所需功能进行优先级排序;在可用的时间表内确定最优先功能的核心功能;进行架构设计,以简化掉落边界优先特征的工作;监督计划进度;并添加破损的边界优先级功能以实现计划目标。本文总结了经验,并讨论了从小型内部电子服务项目到大型政府系统系统应用SAIV收购流程的关键成功因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号