首页> 外文会议>Symposium on Fusion Engineering >The ITER ECH CD Upper Launcher: Steps towards final design of the first confinement system
【24h】

The ITER ECH CD Upper Launcher: Steps towards final design of the first confinement system

机译:ITER ECH和CD上发射器:迈向第一个封闭系统最终设计的步骤

获取原文
获取外文期刊封面目录资料

摘要

The ITER Electron Cyclotron Heating and Current Drive (ECH&CD) Upper Launcher, whose preliminary design was approved in 2009, is on its way towards the final design. The design work is being done by a consortium of several European research institutes in tight collaboration with F4E. The main focus is the finalization of the design of all components for the First Confinement System (FCS), which forms the vacuum and Tritium barrier. The FCS comprises structural components as well as the external waveguide components in the port cell. Structural components of the FCS include the flange seal, backend frame and closure plate. The external waveguide components include the isolation valve, CVD diamond windows, miter bends and straight waveguides. Because finalizing of the design of these components is directly influenced by the layout of many in-vessel components, the design work includes also further development of the entire launcher. This paper summarizes the most recent status of the design work on the structural components of the launcher FCS, which are the support flange, the socket, the closure plate and feed-throughs for waveguides and cooling pipes. The design work includes the engineering layout of these components in accordance with system requirements, load specifications and Quality and Safety classification. An outline of the overall design of the launcher will be presented. The design progress was based on a set of related analyses, of which particular results are given. Also the integration of the associated mm-wave components, assembly strategies, neutronic aspects and the design of the shielding components will be described.
机译:ITER电子回旋加速器和电流驱动(ECH&CD)上发射器的初步设计已于2009年获得批准,目前正在朝着最终设计的方向发展。设计工作是由多家欧洲研究机构组成的财团与F4E紧密合作完成的。主要重点是确定第一隔离系统(FCS)的所有组件的设计,这些组件形成了真空和Tri屏障。 FCS包括结构组件以及端口单元中的外部波导组件。 FCS的结构组件包括法兰密封,后端框架和封闭板。外部波导组件包括隔离阀,CVD金刚石窗口,斜接弯头和直波导。由于这些组件设计的最终确定直接受许多船内组件的布局影响,因此设计工作还包括整个发射器的进一步开发。本文总结了发射器FCS的结构部件的设计工作的最新状态,这些结构部件包括支撑法兰,插座,封口板以及波导和冷却管的穿通孔。根据系统要求,负载规格以及质量和安全分类,设计工作包括这些组件的工程布局。将概述发射器的总体设计。设计进度基于一组相关分析,并给出了特定的结果。此外,还将描述相关毫米波组件,组装策略,中子学方面以及屏蔽组件设计的集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号