Drilling the First Ultra Deepwater Wells Offshore Malaysia

机译:在马来西亚海上钻探第一口超深水井

获取原文

摘要

This paper will address all of the planning and logistical issuesinvolved with drilling the first ultra deepwater wells off thecoast of Malaysia. Murphy Sabah Oil recently contracted theDiamond Offshore Ocean Baroness to drill wells in waterdepths ranging from 1300 m to 2000 m of water.Since a moored rig was used for the project long rangeplanning and engineering was required to moor the rig inworld record mooring depths without any boats or contractorsin the area with ultra deepwater mooring experience.Well design and strategy required the initial string ofconductor casing to be placed at depths exceeding 750 mbelow the mudline. Due to possible high pore pressures, theriserless section was designed to be drilled with water basedmud. The paper will address the logistical and planning issuesinvolved with transporting mud volumes offshore in excess of15000 bbls in an area without deepwater logistical support.The selection and procurement of proper “deepwater” cementwill also be discussed. Synthetic based mud was also a part ofthe drilling strategy. Since synthetic fluids had never beenused before in this area, the planning phase for this fluidrequirement will offer several lessons learned for industry.Well design was further complicated by an abnormallyhigh temperature profile that brought on several well designand strategy issues.The well was also the initial project for a recentlyupgraded rig, which added to the complexity of themobilization along with commissioning requirements. The righad minimal downtime during the project.
机译:本文将解决与马来西亚沿海第一口超深水井有关的所有计划和后勤问题。墨菲沙巴石油公司(Murphy Sabah Oil)最近与钻石近海海洋男爵夫人(Diamond Offshore Ocean Baroness)签约,在水深1300 m至2000 m的水井中进行钻探。由于该项目使用了系泊钻机,因此需要进行长期规划和工程设计,才能在无任何船只的情况下系泊创纪录的系泊深度井的设计和策略要求将最初的导体套管柱放置在泥线以下超过750 m的深度。由于可能存在较高的孔隙压力,因此无井段被设计为使用水基泥浆钻孔。本文将解决在无深水后勤支持的地区向海上运输超过15000桶的泥浆涉及的物流和计划问题。还将讨论选择和采购合适的“深水”水泥的问题。合成泥浆也是钻井策略的一部分。由于以前从未在该领域使用过合成流体,因此该流体需求的计划阶段将为工业提供一些经验教训。异常高温的状况进一步导致井的设计进一步复杂化,这带来了一些井的设计和策略问题。最近升级的钻机的项目,这增加了动员的复杂性以及调试要求。该项目期间的停机时间极短。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号