Design, construction and performance of a tied-wall embankment supported on concrete column ground improvement

机译:混凝土立柱地面改善的隔墙堤防的设计,施工和性能

获取原文
获取原文并翻译 | 示例

摘要

A 5 m high earth fill embankment comprising vertical side-walls constructed from precast concrete wall panels tied together using steel straps was constructed on a 10 m thick deposit of soft clay. Due to the relatively small specified settlement tolerances of the embankment/wall structure, ground improvement in the form of drilled displacement columns (unreinforced concrete columns) was used to improve the engineering properties of the embankment foundation. This paper discusses the design and construction of the embankment and foundation system and compares the predicted settlements with those measured after construction. Discussion on the quality control measures adopted during construction is also provided.
机译:在一块10 m厚的软土沉积物上建造了一个5 m高的土方填筑路堤,包括用钢带绑在一起的预制混凝土墙板构成的垂直侧壁。由于路堤/墙体结构的规定沉降公差相对较小,因此采用了钻孔位移柱(非钢筋混凝土柱)形式的地面改良措施来改善路堤基础的工程性能。本文讨论了路堤和基础系统的设计和施工,并将预测的沉降量与施工后的实测值进行了比较。还讨论了施工过程中采取的质量控制措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号