首页> 外文会议>Soil-structure interaction, underground structures and retaining walls >San Pasquale station of the Linea 6 in Napoli: dewatering field tests, measurements and back-analyses
【24h】

San Pasquale station of the Linea 6 in Napoli: dewatering field tests, measurements and back-analyses

机译:那不勒斯Linea 6的San Pasquale站:脱水现场测试,测量和反分析

获取原文
获取原文并翻译 | 示例

摘要

Since 1839, when the historical railway Napoli - Portici was inaugurated, Napoli has been characterized by a significant system of urban and suburban railways. The idea of a fully integrated urban rail network dates back to the 1950s, but only in 1990s construction began. At present, the system includes 54 km of tracks and 69 stations belonging to 6 lines currently operating; when the City Transport Plan will be completed, 10 lines with 93 km of track and a further 30 km of new light rail linking 114 stations with 21 interchanges are foreseen.
机译:自1839年历史悠久的那不勒斯-波尔蒂奇铁路开通以来,那不勒斯一直以城市和郊区铁路系统为特征。完全整合的城市铁路网络的想法可以追溯到1950年代,但是直到1990年代才开始建设。目前,该系统包括54公里的轨道和69条车站,这些车站属于目前正在运行的6条线路;当《城市交通计划》完成时,预计将有10条线路全长93公里,另外还有30公里的新轻轨连接114个车站和21个立交桥。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号