A bold constructive method for the retaining structures of the excavation of the underground parking Clinics, in Brazil

机译:在巴西地下停车场诊所的开挖固定结构的大胆建设性方法

获取原文
获取原文并翻译 | 示例

摘要

This work presents a heady constructive method used for the retaining structures of the Underground Parking Clinics. The project of the parking includes 315m long for 15,5m wide and 4 undergrounds which work was concluded in the end of 1998. The retaining structures of the excavation was executed through screw piles of 80cm diameter, with 23m of length, spaced at every 2,50 m. The slabs of structure of the parking had been set up with precast beams of prestressed-concrete and the bottom slab with cast in-in-place reinforced concrete. The excavation was accomplished in two phases, in the first one the walls worked as cantilever; and the second one, after the installation of the upper slab working as struts, it was made the final excavation.
机译:这项工作提出了一种用于地下停车诊所的固定结构的令人头疼的建设性方法。停车场项目长315m,宽15.5m,地下4个,于1998年底完工。开挖的保持结构是通过直径80cm,长23m的螺旋桩进行的,每2个间隔,50公尺。停车场的结构板是用预应力混凝土预制梁建造的,底部板是用现浇钢筋混凝土建造的。开挖分两个阶段进行,第一个阶段是将墙用作悬臂。第二个是在上层板作为支柱安装后进行的最后开挖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号